Burnham K2WT Residential Installation, Operating And Service Instructions page 56

Table of Contents

Advertisement

VII. Venting
G. Assembly of Selkirk Polyflue Vent Systems (continued)
c. For each joint, verify that the gasket is evenly seated in the bell (female) end of the pipe. Lubricate this gasket
with mild soapy water. Slide a Pipe Locking Band over the male end of the pipe to be joined as shown in
Figure 7.41. Push the male end of the next section of pipe into the bell until it bottoms out, then back out 1/8—
1/4" to provide room for thermal expansion. Slide pipe locking band over the female end of the connections
and tighten both hose clamps.
d. Assemble the rest of the vent system per the manufacturer's installation instructions, being sure to pitch
horizontal sections back towards the boiler 5/8" per ft.
e. Support each pipe section as described in Polyflue manual at intervals not exceeding the following:
Pipe size
2"
3"
3. Installation of Air Intake System - Start assembly of the PVC air intake system at the boiler. Assembly of the air
intake system is done in the same manner as the vent system except as follows:
a. Drill a 7/32" clearance hole into the front side of the air intake adapter. Insert the first piece of PVC air
intake pipe into the air intake connection and drill a 1/8" tap hole into the PVC which lines up with the 7/32"
clearance hole and secure them together with a #10 x 1" sheet metal screw. Seal the joint between the intake
pipe and the adaptor with RTV.
b. All intake piping may be PVC. There is a 0" minimum clearance between the air intake piping and all types of
construction.
c. To the extent possible, pitch horizontal air intake piping towards the outside.
4. Installation of Horizontal Fitting Terminals (Terminal Option A):
a. See Figure 7.42 for proper orientation of twin pipe horizontal terminals. Outer edge of exhaust coupling must
be 10" or less from the wall surface. (Figure 7.9)
b. Remove the gasket from the end of the integral exhaust coupling and insert Selkirk #2PF-HVST or #3PFHVST
in its place.
c. Add PVC intake per instructions from Section VII - F.
5. Installation of Vertical Fitting Terminals (Terminal Option H):
a. See Figure 7.43 for the proper orientation of twin pipe vertical terminals.
b. Remove the gasket from the end of the integral exhaust coupling and insert Selkirk #2PF-HVST or #3PFHVST
in its place.
c. A 180° bend (or two 90° elbows) are installed on the top of the air intake pipe. If two 90° elbows are used, a
rodent screen can be installed between them (Figure 7.43). If a 180° bend is used, install a rodent screen in
the open side of the bend, using a ring made of PVC pipe. If desired, the termination fittings can be attached
to the end of the intake pipes with field supplied stainless steel screws so that they can be later removed for
cleaning and inspection. If this is done, drill a clearance hole in these fittings and a tap hole in the end of the
intake pipes to accept these screws.
d. Use roof flashings and storm collars to prevent moisture from entering the building. Seal the roof flashing to
the roof using generally accepted practice for the type of roof on the installation. Apply RTV to seal the storm
collars to the vent and intake pipes.
WARNING
Asphyxiation Hazard. Selkirk Polyflue vent systems rely on gaskets for proper sealing.
When this vent system is used, take the following precautions:
• Make sure that gasket is in position and undamaged in the female end of the pipe.
• Make sure that both the male and female pipes are free of damage prior to assembly.
• Only cut vent pipe as permitted by the vent manufacturer in accordance with their Instructions. When
pipe is cut, the cut end must be square and carefully de-burred prior to assembly.
• Use pipe locking bands at all vent pipe joints.
56
Horizontal
Vertical
30in
16ft
39in
16ft
107672-03 - 5/18

Advertisement

Table of Contents
loading

This manual is also suitable for:

K2wt-180b-6t02K2wt-120b-6t00

Table of Contents