6.3.2
Precautions when mounting the outdoor
unit
INFORMATION
Also read the precautions and requirements in the
following chapters:
▪ General safety precautions
▪ Preparation
6.3.3
To provide the installation structure
Check the strength and level of the installation ground so that the
unit will not cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance
with the foundation drawing.
INFORMATION
For information on the available options, contact your
dealer.
If the unit is installed directly on the floor, prepare 4 sets of M8 or
M10 anchor bolts, nuts and washers (field supply) as follows:
INFORMATION
The maximum height of the upper protruding part of the
bolts is 15 mm.
(mm)
In any case, provide at least 300 mm of free space below the unit.
Additionally, make sure the unit is positioned at least 100 mm above
the maximum expected level of snow.
EBLQ05+07C2V3
Daikin Altherma monobloc compact outdoor unit
4P598847-1 – 2019.10
0 mm
(mm)
a
Maximum snowfall height
It is possible to install the unit on brackets to the wall:
a
(mm)
a
Maximum snowfall height
6 Installation
Installer reference guide
13