Veris Industries E31E Series Installation Manual page 8

Split-core panelboard monitoring system
Hide thumbs Also See for E31E Series:
Table of Contents

Advertisement

Installation Guide
Power Monitoring
E31E Series
Installation (cont.)
Z206855-0B
Page 8 of 26
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
1.888.610.7664
3. Choose a location to mount the adapter boards in the same panel as the E31E. Mount the adapter boards using either DIN rail or
SNAPTRACK.
A. DIN Rail: Use the supplied screws to secure the plastic DIN clip to the adapter board. Affix the clip to the DIN rail.
B. SNAPTRACK: Secure the SNAPTRACK to the mounting surface. Click the adapter board into place.
4. Install the current sensors onto the conductors to be monitored.
Orientation Note: If the signed power factor feature is NOT enabled, then the current sensor orientation does not affect meter
behavior. If this feature IS enabled, orient the current sensors so that the arrow points toward the load for proper operation.
Note: Clean split-core contact surfaces before closing. The hinge can detach, allowing the base and the top to separate for
easier cleaning and installation.
The 50 A CT accepts a maximum #2 AWG (0.384" O.D.) wire with THHN insulation.
The 100 A CT accepts a maximum 3/0 AWG (0.584" O.D.) wire with THHN insulation.
The 200 A CT accepts a maximum of 350 MCM wire with THHN insulation.
©2014 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
www.calcert.com
15
10
20
5
25
0
30
DIN Option 1: Vertical Mount
DIN Option 2: Horizontal Mount
sales@calcert.com
TM
Close current sensors until the clasp
clicks into place to ensure that contact
surfaces are firmly seated.
04142