Veris Industries E31E Series Installation Manual page 11

Split-core panelboard monitoring system
Hide thumbs Also See for E31E Series:
Table of Contents

Advertisement

Installation Guide
Power Monitoring
E31E Series
Wiring
Z206855-0B
Page 11 of 26
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
1.888.610.7664
For all steps in this section, when tightening terminals, apply the correct torque.
Aux Inputs: 3.5 to 4.4 in-lb (0.4 to 0.5 N-m); all other terminals: 4.4 to 5.3 in-lb (0.5 to 0.6 N-m).
1. Wire the CTs to the E31E. Note: For Veris CTs, X1 is the white lead, X2 is the black lead.
2. Connect 2-wire 100-277 VAC power to the control power terminals. Observe polarity. Connect voltage lines to the voltage taps.
Equip voltage lines with fuses and disconnects as required.
Voltage Inputs
90-300V 50/60Hz
VN
V3
V2
V1
L-L
L-N
Voltage taps are shared by both panels.
3. Connect the 2-wire Modbus RS-485 network.
©2014 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
www.calcert.com
15
10
20
5
25
0
30
Control Power
100-277V 50/60Hz 15VA
V
V2/N
V1
V2/N
RS-485
S
S
+
+
sales@calcert.com
TM
04142

Advertisement

Table of Contents
loading

Table of Contents