Download Print this page

Keysight N5241AU-944 Installation Notes page 25

Add 4-port capability upgrade kit

Advertisement

Step 16.Assemble the A29 - A32 Test Port Coupler Assemblies
1. Remove the A29 test port 1 coupler and A32 test port 2 coupler from the PNA. For instructions,
click the Chapter 7 bookmark, "Removing and Replacing the A29 - A32 Test Port Couplers" in
the PDF Service Guide
2. If your analyzer's serial number prefix is MY/SG/US5321 and above: Using pliers, remove the
adhesive bumper on the A29 test port 1 coupler and on the A32 test port 2 coupler.
3. If your analyzer's serial number prefix is MY/SG/US5310 and below: Discard the test port
couplers you just removed from the PNA. These old couplers have 2.4 mm connectors and
must be replaced with the new couplers (3.5 mm connectors) included in the kit.
4. Follow the two instructions shown in
this document.
Figure 10
A29 - A32 Test Port Coupler Assembly
"Downloading the Online PNA Service Guide" on page 5
1. See
Installation Note N5242-90017
1
.
Figure
Installation Procedure for the Upgrade
10. New parts are listed in
.
Table 1 on page 7
of
24

Advertisement

loading

This manual is also suitable for:

N5242au-944N5249au-944N5242-60109