Part 8 - Water Piping; General Plumbing Connection Guidelines - Westinghouse WBRC 140F Series Installation & Start-Up Instructions

Gas fired residential combi boiler floor mount
Hide thumbs Also See for WBRC 140F Series:
Table of Contents

Advertisement

PART 8 – WATER PIPING
A. GENERAL PLUMBING CONNECTION GUIDELINES
Pipe material must be suitable to meet local codes and industry standards.
The pipe must be cleaned and without blemish before any connections are made.
Do not apply a torch within 12" of the appliance. Doing so could damage the appliance. Such damages ARE NOT covered by
product warranty.
The size of the hot water pipe should be ¾" diameter and the central heating water pipe should be 1" in diameter.
To ease future maintenance isolation valves are recommended on both the CH and DHW loops.
All piping should be insulated.
Figure 20 – Operating Description
32
WHL-015 REV. 1.13.17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wbrc 199f seriesWbrclp140f

Table of Contents