Samsung AR HPFS Series User's Manual & Installation Manual page 32

Table of Contents

Advertisement

Step 1.4 Drilling a hole through the wall
Before fixing the installation plate to a wall and then
fixing the indoor unit to the installation plate, a window
frame, or a gypsum board, you must determine the
position of a hole (with 65 mm inner diameter) through
which the pipe bundle (consisting of power and
communication cables, refrigerant pipes, and drain hose)
will pass and then drill that hole.
1. Determine the position of a 65 mm hole in
consideration of the possible directions of the pipe
bundle and the minimum distances between the
hole and the installation plate.
Left
<Possible directions of the pipe bundle>
CAUTION
• If changing the pipe direction from left to right,
do not drastically bent it but slowly turn it in the
opposite direction as shown. Otherwise, the pipe
may be damaged in the process.
<Minimum distances between the hole and the
installation plate>
Model
✴✴09✴✴LN/RC
✴✴09✴✴PF/SG
✴✴12✴✴
✴✴18✴✴LN/RC
✴✴18✴✴PF/SG
✴✴24✴✴
DB68-06031A-01_A5.indd 31
Right
Rear right or left
Bottom right
Pipe bundle hole
(Unit : mm)
A
B
C
D
36
60
65
36
36
120
81
36
36
190
81
36
33
110
110
33
Pipe bundle hole: Ø 65 mm
2. Drill the hole.
CAUTION
• Be sure to drill only one hole.
• Make sure that the hole slants downwards so that
the drain hose slants downwards to drain water
well.
Indoor unit
<The hole slants downwards>
Step 1.5 Taping the pipes, cables, and drain
hose
1. Wrap foam insulation on parts without insulation
on the ends of the refrigerant pipes, as shown in
the figure. This wrapping minimises condensation
problem.
Insulation
Refrigerant pipes
2. Wind the refrigerant pipes, power cable,
communication cable and drain hose with vinyl
tape to make a pipe bundle.
Installation plate
Vinyl tape
Power and communication cables
(assembly cable)
Drain hose
Wall
Drain hose
Refrigerant pipes
(assembly pipe)
English
31
4/18/2017 8:59:42 AM

Advertisement

Table of Contents
loading

Table of Contents