Connect Copy Job Flow
Connect Copy Job Flow
The job flow depends on the status of the two machines.
When One of the Two Machines is Idle
Explains the job flow when one of the machines is copying Original A.
5
BAT130S
Using the idle machine as the main machine (Connect Copy)
1.
Make Connect Copy settings for Original B on machine <2> (the idle machine).
BAT131S
215