Horizontal Discharge Installation - Broan E6436SSLC Installation Manual

Table of Contents

Advertisement

6. CHOSE THE OPENING(S)
Remove the knockout for the chosen opening(s) (horizontal at the back of the hood or vertical on top). See illustrations below.
V
ERTICAL DISCHARGE
H
ORIZONTAL DISCHARGE
Punch out the appropriate electrical knockout hole on top (A) or back (B) of the
hood. Install the wire clamp (included in parts bag).

7. HORIZONTAL DISCHARGE INSTALLATION

All internal blower hoods are factory shipped with the blower(s) mounted for a vertical discharge configuration. For a horizontal discharge
configuration, disassemble the blower(s) from the inner top of the hood and mount it (them) to the back panel of the hood. The procedure
below applies for one or two motors.
Unplug the blower.
Using a 5/16" socket, remove all blower mounting
screws from the inner top of the hood. Keep the
screws for further use.
(INTERNAL BLOWER HOODS ONLY)
1
1
HR0021
(INTERNAL BLOWER(S) ONLY)
HE0085
L
S
EFT
IDE
S
L
CREWS
HD0269
9
2
2
A
HR0024
M
OUNTING
OCATION
3
3
B
R
S
IGHT
IDE
M
S
OUNTING
CREWS
L
OCATION
HD0282

Advertisement

Table of Contents
loading

This manual is also suitable for:

E64000lc seriesE64e30sslcE64e42sslcE6430sslc

Table of Contents