Before Operation; Overview: Before Operation; To Mount The User Interface Holder; To Insert The Batteries - Daikin FTXF25D5V1B User Reference Manual

Hide thumbs Also See for FTXF25D5V1B:
Table of Contents

Advertisement

4 Before operation

4.1 Overview: Before operation

4.2 To mount the user interface holder

4.3 To insert the batteries

FTXF20~42D5V1B + ATXF20~42D5V1B
Daikin room air conditioners
4D520466-13G – 2021.12
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Inserting the batteries in the user interface.
Fixing the user interface to the wall.
Turning on the power supply.
a
b
a User interface
b Screws (field supply)
c User interface holder
1 Choose a place where the signals reach the unit.
2 Attach the holder with screws to the wall or a similar location.
3 Hang the user interface on the user interface holder.
The batteries will last for about 1 year.
1 Remove the back cover.
2 Insert both batteries at once.
3 Put the cover back.
1
c
3
2
AAA.LR03
4
Before operation
|
User reference guide
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents