10.1 Checklist before commissioning..........13 Daikin website (publicly accessible). 10.2 Checklist during commissioning ..........13 ▪ The full set of latest technical data is available on the Daikin 10.3 To perform a test run..............13 Business Portal (authentication required). 10.3.1 To perform a test run in winter season .......
Page 4
A phase advancing capacitor will reduce performance and may DANGER: RISK OF EXPLOSION cause accidents. Do NOT start the unit if it is vacuumed. Installation Manual FTXF20~42C5V1B Daikin room air conditioners 3P519299-9X – 2020.12...
Do NOT remove the fan guard. When the ▪ Indoor temperature: 18~32°C DB fan is rotating at high speed, it will cause injury. ▪ Indoor humidity: ≤80% FTXF20~42C5V1B Installation Manual Daikin room air conditioners 3P519299-9X – 2020.12...
Result: The front panel shaft on 1 side will be disconnected. Make sure installation, servicing, maintenance and repair 3 Disconnect the front panel shaft on the other side in the same comply with instructions from Daikin and with applicable manner. legislation (for example national gas regulation) and are executed only by authorised persons.
Wall embedded pipe Putty Wall hole cover 4 After completing wiring, refrigerant piping and drain piping, do Service cover screw NOT forget to seal the gap with putty. Service cover FTXF20~42C5V1B Installation Manual Daikin room air conditioners 3P519299-9X – 2020.12...
▪ Install the drain hose with a downward slope. insulation tape. ▪ Traps are NOT permitted. ▪ Do NOT put the end of the hose in water. Right-side piping Right-bottom piping Right-back piping Installation Manual FTXF20~42C5V1B Daikin room air conditioners 3P519299-9X – 2020.12...
1 Remove the air filters. insulation. 2 Gradually pour approximately 1 l of water in the drain pan, and check for water leaks. Connecting the refrigerant piping DANGER: RISK OF BURNING/SCALDING FTXF20~42C5V1B Installation Manual Daikin room air conditioners 3P519299-9X – 2020.12...
Note: In case the interconnection cable was stripped in advance, cover the ends with insulating tape. FTXF20~42C5V1B Installation Manual Daikin room air conditioners 3P519299-9X – 2020.12...
2 Press the bottom frame of the unit with both hands to set it on the bottom hooks of the mounting plate. Make sure that the wires do NOT get squeezed anywhere. Installation Manual FTXF20~42C5V1B Daikin room air conditioners 3P519299-9X – 2020.12...
3 The system stops operating 3 minutes after the unit is turned OFF. Make sure drainage flows smoothly. Possible consequence: Condensate water might drip. The system is properly earthed and the earth terminals are tightened. FTXF20~42C5V1B Installation Manual Daikin room air conditioners 3P519299-9X – 2020.12...
MUST comply with applicable legislation. Units MUST be treated at a specialised treatment facility for reuse, recycling and recovery. Installation Manual FTXF20~42C5V1B Daikin room air conditioners 3P519299-9X – 2020.12...
▪ A subset of the latest technical data is available on the regional monitor green) Daikin website (publicly accessible). HIGH VOLTAGE High voltage ▪ The full set of latest technical data is available on the Daikin Intelligent eye sensor Business Portal (authentication required). IPM* Intelligent power module...
Page 16
12 Technical data Symbol Meaning Terminal strip (block) Electronic expansion valve coil Y*R, Y*S Reversing solenoid valve coil Ferrite core ZF, Z*F Noise filter Installation Manual FTXF20~42C5V1B Daikin room air conditioners 3P519299-9X – 2020.12...
Page 20
DAIKIN ISITMA VE SOĞUTMA SİSTEMLERİ SAN.TİC. A.Ş. Gülsuyu Mahallesi, Fevzi Çakmak Caddesi, Burçak Sokak, No:20, 34848 Maltepe İSTANBUL / TÜRKİYE Tel: 0216 453 27 00 Faks: 0216 671 06 00 Çağrı Merkezi: 444 999 0 Web: www.daikin.com.tr 3P519299-9X 2020.12 Verantwortung für Energie und Umwelt...
Need help?
Do you have a question about the FTXF20C5V1B and is the answer not in the manual?
Questions and answers