ERGA04~08E + EHVZ04+08S18+23E
Daikin Altherma 3 R F
4P629093-1B – 2022.05
X 1 A
3
X 1 4 Y
4
3 Remove the switch box cover.
4×
T25
4 If necessary, remove the front plate. This is, for example, necessary in the
following cases:
▪
"7.2.5 To lower the switch box on the indoor
"7.4.4 To connect the drain hose to the
▪
▪ When you need access to the high voltage switch box
2×
T25
5 If you need access to the high voltage components, remove the high voltage
switch box cover.
7
Unit installation
|
4
unit" [
60]
4
drain" [
69]
Installer reference guide
59