General DataComm 551 Operating And Installation Instructions page 46

Intelligent channel service unit
Table of Contents

Advertisement

INSTALLATION
EQUIPMENT CONNECTOR (25-PIN FEMALE, LABELED
BUSINESS EQUIP 1 - BUSINESS EQUIP 4 (CONNECTS
THE MULTIPLEXER TO THE CSU.
PIN NO.
FUNCTION
1
FRAME GROUND
2
SEND DATA (TIP)
3
RECEIVE DATA (TIP)
14
SEND DATA (RING)
16
RECEIVE DATA (RING)
TERMINALS 1 AND 2 ON 4-POSITION TERMINAL BLOCK (LOCATED
UNDER WHITE PLASTIC COVER, AND LABELED TB1 - TB4 (CONNECT
THE TELCO-PROVIDED 60 MA DC CONSTANT CURRENT SOURCE TO
PROVIDE POWER TO THE T1 SPAN.
TERMINAL NO.
FUNCTION
1
MA OUT
2
MA IN
3
FLF
4
FLF
FLF: FAULT LOCATION FILTER (FUTURE USE)
NETWORK INTERFACE CONNECTOR (RJ48C, LABELED NET 1 - NET 4)
CONNECTS THE NETWORK TO THE CSU.
CABLE
CABLE
022H024-XXX
022H021-XXX
PIN NO.
WIRE COLOR
1
ORN/WHT
2
WHT/ORN
4
BLU/WHT
5
WHT/BLU
7
DRAIN
NOTE: THE REMAINING LEADS ARE NOT USED.
SUPERVISORY PORT CONNECTOR (25-PIN MALE, LABELED
AUXILIARY 1 - AUXILLIARY 4) CONNECTS THE SUPERVISORY
TERMINAL TO THE CSU.
PIN NO.
FUNCTION
2
SEND DATA
3
RECEIVE DATA
4
REQUEST TO SEND
7
SIGNAL GROUND
8
CARRIER DETECT
THIS PORT IS ENABLED ONLY WHEN PMC-100 OPERATION IS DISABLED.
FIGURE 2-10. UNIVERSAL SYSTEM SHELF INSTALLATION
2-20
DIRECTION
N/A
TO CSU
FROM CSU
TO CSU
FROM CSU
FUNCTION
RECEIVE DATA (RING)
RECEIVE DATA (TIP)
SEND DATA (RING)
SEND DATA (TIP)
SHIELD (FRAME GND.)
DIRECTION
TO CSU
FROM CSU
TO CSU
N/A
FROM CSU
X BUS CONNECTORS FOR COMMUNICATION BETWEEN
PMC-100s. REFER TO PMC-100 MANUAL FOR DETAILS.
DIRECTION
TO CSU
TO CSU
FROM CSU
FROM CSU
N/A

Advertisement

Table of Contents
loading

Table of Contents