Exmark ULTRAVAC Operator's Manual page 15

Hide thumbs Also See for ULTRAVAC:
Table of Contents

Advertisement

1. Blower
2. Belt cover
12.
Install the knob and its hardware.
13.
Slip the upper and the lower tubes together.
14.
Insert the upper tube into the hood seal – push in
then pull out so that the seal is extended outward.
15.
Align the dimple on the upper tube with the end
of hood seal and center between the two screws
as shown in Figure 15.
1. Dimple
16.
Set the deck in lowest cutting position.
17.
Slide the lower tube onto the blower outlet and
attach the latches. (Make sure that the upper tube
does not move out of alignment).
18.
If the lower tube is replaced, drill three 7/32 inch
holes in the lower tube using the upper tube holes
as reference. See Figure 16.
19.
Remove the tubes from unit and assemble the
upper and the lower tubes using three #10-24
x 3/4 inch hex washer head screws, three #10
Figure 14
3. Deck lip
Figure 15
washers, and three #10-24 nyloc nuts. The screw
head should be installed to the inside of the
tube to provide minimum obstruction to flow.
Make sure that the upper and the lower ends are
oriented properly as the tubes are assembled.
g009341
1. Drill the holes here
20.
Slide the lower end of the tube assembly over the
blower outlet and align the notch with the tube
latch. Latch the tube to the blower.
21.
Install the caster weights.
A.
On the LH side, insert the 3/8-16 x 6 1/2
inch screw into hole on the bottom side of the
bracket and the rear of the removable 45 lb
(20.4 kg) caster weight as shown in Figure 17.
Carefully place the weight and bracket
assembly onto the caster arm centering the
hole of the weight over the caster wheel.
g007027
15
Operation
Figure 16
g007028

Advertisement

Table of Contents
loading

This manual is also suitable for:

126-8680

Table of Contents