Exmark ULTRAVAC Operator's Manual page 14

Hide thumbs Also See for ULTRAVAC:
Table of Contents

Advertisement

Operation
Right side shown
1. Rod support assembly
2. Bagger pin
3. Washer
5.
Raise the hood and install the bag assemblies by
inserting the hook portion into the slots in the
bagger support rods.
6.
Remove the belt cover on the right side of the
deck.
7.
Mount the blower on the deck by inserting the
mounting pin into the tube welded to the rear
corner of the deck (see Figure 11). Pivot the
blower until the front pin engages the slot in
the deck. Adjust the position of the front pin
if necessary to engage the slot. Use the latches
to lock the blower in this position. Adjust the
tension on the latch to hold the blower up to the
deck, yet allow for release by hand.
1. Slot
2. Front pin
3. Blower latch
Figure 10
4. Mount pin with lanyard
5. 1/2 inch lock nut
Figure 11
4. Mounting pin
5. Deck tube
8.
Pull the spring loaded idler back and slip the belt
in the upper groove of the deck sheave.
View from Top of Blower
g242046
1. Impeller sheave
2. Deck sheave
9.
Position the belt cover at an angle and slide it
under the mower frame (see Figure 13).
1. Blower
2. Belt cover
10.
Push down on the back of the cover and slide it
backwards under the blower.
11.
Slide the belt cover forward until it is seated under
both lips on the deck.
g242047
14
Figure 12
3. Spring loaded idler
Figure 13
3. Mower frame
g009311
g242180

Advertisement

Table of Contents
loading

This manual is also suitable for:

126-8680

Table of Contents