Operating Instructions - YASKAWA DCR-1500 User Manual

Re-combiner
Table of Contents

Advertisement

6. OPERATING INSTRUCTIONS

Fig. 6.1 – Re-Combiner Switches On/Off Positions
The Re-Combiner contains five user-operable disconnect switches for the PV Output
Circuit inputs (see Fig. 6.1). When the disconnect switch handle is in the OFF position, the
circuit is open between the PV Output Circuit and the DC bus in the Re-Combiner.
Conversely, when the disconnect switch is in the ON position, the circuit is closed between
the PV Output Circuit and the DC Bus in the Re-Combiner.
The disconnect switch is rated for 400A, is fully load-break rated and can be safely
operated under normal operating conditions when installation is per this User's Manual
and all warnings and ratings are observed.
All Disconnect Switches must be OFF before working on the Re-Combiner.
See also the User's Manual for the PVS-500 Energy Storage System.
Yaskawa Solectria Solar
ON
90°
OFF
DOCR-071068-E
Page 16 of 18

Advertisement

Table of Contents
loading

Table of Contents