Ice Transport Tube - Follett Horizon Elite Chewblet H D710ABS Series Installation Instructions Manual

Ice storage bin
Table of Contents

Advertisement

Install the ice transport tube.
5.1
Ice transport tube installation
Ice transport tube tips
• Insulate entire length of ice transport tube
• Secure ice transport tube
runs see guide on page 14.
• Pitch ice transport tube at least 1/4" per foot (6,4 mm/0,3m)
• Ice transport tube must drain towards ice machine
Ice transport tube to bin
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
Ice transport tube to Ice machine
• Be sure tube ends are square
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Push ice transport tube onto ice machine nipple
• Install hose clamp
8
1/4˝ (6,4mm)
as needed to prevent dips and traps from forming. For long tube
Hot Water
160 F (71 C)
1' (0,3m)
self-contained

Ice transport tube

BIN • RIDE Technology
5

Advertisement

Table of Contents
loading

Table of Contents