Pro - Applying Jar Updates - evertz 7880IP-ASI-IP Manual

Table of Contents

Advertisement

7700/7800 MultiFrame Manual
7880IP-ASI-IP IP/ASI/IP Converter
Figure 5-2: VistaLINK
PRO – Applying JAR Updates
®
You will be prompted to restart the server to enable the change to take effect. Apply as many JAR
updates as required before restarting the server.
NOTE: You may confirm that all updates have been successfully applied by
selecting from the menu Tools>View>Show/Hide Product update log.
From the menu, shutdown the server by selecting File>Shutdown Server. Now re-open the server, it is
normal for the start-up to take marginally longer while each individual update is being applied. Once
complete, you may restart the VLPro Clients. As the Client restarts you will experience a short delay
while the update is applied. A prompt will appear confirming that the updates have been applied.
Page 21
Revision 1.1

Advertisement

Table of Contents
loading

Table of Contents