Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 18
EN
3. Open the snap and lengthen the tube (pic. 2);
Note
There are three sections of the tube. Adjust the height of the tube according to your
requirements.
4. Assemble the hanger (pic. 3);
5. Put the hanger on the top of the adjustable tubes (pic. 4);
6. Fix the ironing board on the adjustable tubes (pic. 5);
7. You can place the ironing board vertically or horizontally (ріс. 6,7);
8. Place the steam nozzle on the hanger;
9. Turn on the water tank knob and fill the tank with water;
10. After filling with water, tighten the water tank knob, then put the water tank into the device
(pic. 8);
11. Clean the holes on the soleplate so the dirt, perhaps caught in the holes during the
manufacture of the appliance, could not stain the fabric.
Note
Before switching on the unit, make sure that the mains voltage corresponds to the
voltage specified on the body of the unit.
12. Unreel the cord and plug into an outlet.
13. Turn the power button.
14. Before using the appliance for the first time steam a piece of unnecessary fabric, this will
remove any impurities and odors that might have been left by the manufacturing process and to
make sure the surface is clean enough.
15. When the appliance is not in use, turn the power button to the «Off» position, then
disconnect the appliance from the power supply and put it back in place.

Operation

1. Remove the water tank.
2. Pull up the cower of water tank and carefully fill the water tank with cold water.
3. Close the cower of water tank.
4. Install the water tank back correctly and monitor the water level to prevent water shortages
during use.
5. Select the necessary position of the board:
- Vertical ironing scheme (Fig. 6);
- Flat ironing scheme (Please adjust the height of the device according to your requirements)
(Fig. 7);
6. Unscrew the power cord for the entire length and insert the power cord plug into the wall
outlet.
7. Turn the power button.
8. Launch the first portion of the steam before starting work, as it may contain droplets of
water.
9. When finished, turn the power button to the «off» position and disconnect the appliance
from the mains.
10. After about 30 minutes, when the device cools down, drain the water from the tank and
remove the device for storage.
18

Advertisement

Table of Contents
loading

Table of Contents