VWR Homogeniser User Manual page 4

Mini bead mill
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
1.
2.
3.
4.
5.
Connect power cord
4
Unpacking
Lift foam from box.
Lift unit up and off of the box bottom.
DO NOT LIFT THE UNIT BY HOLDING THE LID.
Remove Tool Kit and Power Cord
Remove the 2 screws from the bottom of the unit.
Place the unit on a stable surface.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents