Verifying The Ac Power Supply Voltage And The Serial Numbers; Figure 6-2 - Hydran 201Ti Assembly - GE Hydran 201 i Instruction Manual

Hide thumbs Also See for Hydran 201 i:
Table of Contents

Advertisement

Chapter 6 • Hydran 201Ti Installation
Valve
Six lockwashers
Six 1/4-28 cap screws
Supervisory link (and analog
output) termination board
ac power supply terminal block
All procedures in this manual must be strictly adhered to. Any
WARNING
CAUTION
deviation from these could cause irreversible damages to the
transformer being monitored and/or the Hydran 201i System, and
could lead to property damage, personal injury and/or death. Instal-
lation and maintenance of the Hydran 201i System must be carried
out by qualified personnel only.
6.3.1

Verifying the ac Power Supply Voltage and the Serial Numbers

Ensure step 3 on page 6-3 and step 5 on page 6-5 have been performed.
6-18
Brass adaptor
Sensor cable
CPU module
Aluminum cover
Two screws (to fasten the CPU module)

Figure 6-2 - Hydran 201Ti Assembly

Rev. 6, March 2011
H201 sensor
Heating plate
Alarm contacts
terminal block
Knob
Input/output
(I/O) module
Part 17997

Advertisement

Table of Contents
loading

Table of Contents