This page is used to set the schedules, holidays and alternate days that are used to control the unit operation
when the Schedule Start/Stop on the System Page (Configure Pages) is enabled.
In Schedule Setting, the schedule for startup or shutdown of the unit can be set based on week, holiday or alternate
day. Each day can have four settings (maximum).
To set a new time setting,: click button
up or down buttons, use the
Special Day refers to holiday or alternate days. Actual calendar dates can be set as holiday or alternate days.
or
are used to change month and year of the dates required.
is used to set holidays.
is used to set alternate days.
These days then used the settings programmed in the Schedule Setting to control unit operation.
Note that: each group of special days has 30 days (maximum).
6-12
to create a default item, then click this item and change the time using the
button to enable startup or shutdown timing, and [Confirm] the modification.