Delivery and Storage

To ensure consistent quality and maximum reliability,
all units are tested and inspected before leaving the
factory. The chiller may be ordered and shipped in any
of the following forms:
Form 1 (shipped complete)
Form 2 (shipped without refrigerant charge)
Units are filled with YORK L oil and shipped without
export crating, unless crating has been specified on the
Sales Order.
If the unit is to be put into storage, prior to installation,
the following precautions should be observed:
Ensure that the unit is not exposed to wind and
rain.
Ensure
that
all
openings,
connections, are securely capped.
The unit should be stored in a location where there
is minimal activity to limit the risk of accidental
physical damage.
To prevent inadvertent operation of the pressure
relief devices the unit must NOT be steam cleaned.
It is recommended that the unit be periodically
inspected during storage.
If the unit is stored for longer than six months, you
must comply with screw chiller requires long-term
storage requirements detailed in documents (Form
50.20-NM9 / Form 50.20-CL9 / Form 50.20-NM1).

Inspection

The unit shipment should be checked on arrival to see
that all major pieces, boxes and crates are received.
Each unit should be checked on the trailer or rail car
when received, before unloading, for any visible signs
of damage. Any damage of signs of possible damage
must be reported to the transportation company
immediately for their inspection.
When received at the job site,all containers should be
opened and the contents checked against the packing
list. Any material shortage should be reported to YORK
immediately.
3-2
Rigging
Prior to moving the unit, ensure that the installation site
is suitable for installing the unit and is easily capable
of supporting the weight of the unit and all associated
services.
The unit should be lifted in accordance with the written
rigging and lifting plan, using chains and shackles. The
shackles should be inserted into the respective holes in
the tube end sheets (lifting holes in the tube end sheet
are for a 6.8 shackle).
Use spreader bars to avoid lifting chains hitting the
chiller. Various methods of spreader bar arrangements
may be used, keeping in mind the intent is to keep the
unit stable and to keep the chains from hitting the chiller
and causing damage.
such
as
water
Do not move the unit on rollers, or lift it using
a forklift.
EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents