NEC SL2100 Hardware Manual page 58

Hide thumbs Also See for SL2100:

Advertisement

ISSUE 4.0
ETH Lug
to Earth
Screw
• The grounding cable is supplier-provided.(not attached to the system)
Each chassis in the system must be grounded separately using the procedure listed below.
1.
Loosen the screw.
2.
Insert a grounding wire (user supplied).
3.
Tighten the screw.
4.
Connect the grounding wire to earth ground.
Proper grounding is very important to protect the system from external
noise and to reduce the risk of electrocution in the event of a lightning
strike.
1.8.2
AC Power Requirement
A dedicated 100V-120V/220V/230V/240V 50/60Hz circuit located within two meters of the Chassis is
required. A separate dedicated AC outlet is necessary for each Chassis.
Double Pole/Neutral Fusing
(Power supply fuses are located at both the L and N side.)
Power Requirement
Power Consumption
Input Voltage (Rated Voltage)
Frequency
Phase and Wire
INSTALLING THE MAIN & EXPANSION CHASSIS
AC Power Inlet
Figure 2-25 ETH Lug
Table 2-9 Power Requirement
110VAC
120VAC
110 VAC@15 A 120 VAC@15 A 220 VAC@15 A 230 VAC@15 A 240 VAC@15 A
Main Chassis =
Main Chassis =
143 VA
150 VA
3 Chassis Total
3 Chassis Total
= 429 VA
= 450 VA
90 VAC to 264 VAC (100VAC/120VAC/220VAC/230VAC/240VAC)
47 Hz - 63 Hz (Rated Frequency: 50/60 Hz)
Single Phase, 2 Line + PE Type
220VAC
230VAC
Main Chassis =
Main Chassis =
185 VA
182 VA
3 Chassis Total
3 Chassis Total
= 541 VA
= 545 VA
SL2100
240VAC
Main Chassis =
182 VA
Chassis Total =
547 VA