7.2.12. Setting the FPC HDD BAT
1. Fix the FPC HDD BAT using the Screw. <N16>
2. Connect the 2 Cables to the 2 Connectors. (CN7,CN8)
3. Connect the Cable to the Connector. (CN800)
4. Attach the PAD Protect Sheet.
5. Connect the Cable to the Connector. (CN9)
6. Attach the Tape.
7. Connect the 2 Cables to the 2 Connectors. (CN10,CN26)
8. Attach the Tape.
9. Attach the Antenna Cable Sheet on the Main PCB.
10. Fix the HDD FPC BAT using the 4 Screws. <N29> No1 to
No4
Note:
Tighten the Screws in the numbered order (No1 to No4).
Screw <N16>: DRQT26+E5FKL
Screw <N29>: DRQT26+E3FNL
■ Preparation of HDD FPC ASSY
Fold mountain based
on the white line.
Not to forget folding
Order of fixing
Screw
Screw
7-25
FPC HDD BAT
No.1
<N29>
No.4
No.2
<N29>
<N29>
No.3
<N29>
HDD Cable Cover
Pad Protect
Sheet
Connector
(CN8)
Connector
(CN7)
Pad PCB
Tighten of
Tighten of
Screw
Screw
Not to forget folding
Battery Connector PIN
Cushion is set
to Connector (CN8)
to Connector (CN7)
<N16>
to Connector (CN800)
Antenna Cable Sheet
to Connector (CN26)
Tape
Connector(CN10)
Connector(CN26)
Tape
Connector(CN9)
Connector (CN800)
Battery Guide
Battery Connector
is set
PIN is set