Installation; Unpacking Purelab 7000 - Us; External Services And Connections - ELGA PURELAB 7000 - US Quick Start Manual

Hide thumbs Also See for PURELAB 7000 - US:
Table of Contents

Advertisement

ELGA
2.1

Unpacking PURELAB 7000 - US

Maintenance
Electrical Supply
Site
Water Supply
2.2

External services and connections

Connection
Feed water inlet*
Pressurised drain
Application loop feed
Application loop return
Electrical supply
* Refer to Operator Manual for feed water specification.
commissioning is commenced.

2. INSTALLATION

Access is required to the front of the unit for regular maintenance procedures. Occasional
access is required to the top of the unit to add chemical during sanitization.
For safety reasons it is recommended that this unit be connected to a suitable power outlet
which is easily accessible and local to the unit.
The unit can be floor or bench mounted. Ensure the bench is designed to take a load in
excess of 150kg and that the weight of other equipment is also taken into consideration.
Local potable supply with a means of isolation.
Termination
15 mm OD push fit
15 mm OD push fit
15 mm OD push fit
15 mm OD push fit
IEC 950
PURELAB 7000 - US MANU40593 Version 02 - 02/16
The following items are supplied:
PURELAB 7000 - US
Electrical supply lead.
Quick reference guide fitted on inside of door.
Consumer Starter Kit 1 or 2.
Installation kit.
Specification
Flow
Pressure
Temperature
Maximum flow
Maximum distance to drain
Maximum back pressure
Maximum pipe length to
application
Maximum pipe length from
application
Electrical rating
Suitability of water supply must be confirmed before
PURELAB 7000 - US Quick Start Manual
Unit of Measure
Metric
>9 l/min
>2.4 USG/min
2 to 6 bar
30 to 88 psi
4 to 40C
39.2 to 104F
6 l/min
1.6 USG/min
3 m
10 ft
0.6 bar
9 psi
25 m
90 ft
25 m
90 ft
230 V, 50 Hz ac 13 amp
115 V, 60 Hz ac
US / Imperial
Page 3

Advertisement

Table of Contents
loading

Table of Contents