Summary of Contents for ELGA PURELAB 7000 - US

  • Page 1 PURELAB 7000 - US Operator Manual...
  • Page 3: Table Of Contents

    6.2.3 Sanitization Chemical Safety Data ......35 TROUBLE SHOOTING ............36 KEY TO CONTROL PANEL ..........37 TECHNICAL SPECIFICATION ........... 38 WARRANTY / CONDITIONS OF SALE ......40 USEFUL CONTACT DETAILS ........... 41 Page 1 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 4: Introduction

    1. INTRODUCTION Use of this Manual ELGA LabWater strives to produce manuals that are as simple and accurate as possible. However, should you feel they can be improved in any way please email us at info@elgalabwater.com. This manual guides you through the installation, commissioning and basic operation of the PURELAB 7000 allowing you to obtain a guaranteed supply of purified water to meet your requirements.
  • Page 5: Consumables

    Service Life is an estimate only, and will depend on the application and feed water quality. Care should be taken to order the correct consumable items. ** Optional - Consumables not fitted as standard. Fit only after consultation with ELGA Technical Support. Page 3 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 6: Installation And Commissioning

    Installation The unit is supplied with a quick start manual that allows the unit to be quickly installed and commissioned. It is recommended that a trained ELGA representative carry out the installation of the product. Commissioning The unit is supplied with the software set in a commissioning mode that must be completed before being used to supply the application.
  • Page 7: Controls

    PURELAB 7000 - US Operator Manual CONTROLS The PURELAB 7000 - US control panel has a range of control icons. General icons are as follows. Further icons are described in the appropriate sections. A complete listing is included in Section 8.
  • Page 8: System Preferences

    ELGA System Preferences When the PURELAB 7000 - US unit is started for the first time after completing the commissioning routine the following steps should be carried out to set up your choices: Note: Your choices can be changed and implemented during normal operation. It is not necessary to stop the unit.
  • Page 9 L (Litres) or USG (US Gallons). This only indicates the volume in the reservoir. PRESS to change L or USG PRESS ✔ to proceed to Step 6. PRESS ✔ . Set units of measure - volume Page 7 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 10 PRESS to select alarm point, in increments of 1, ranging from 1 to 10 M.cm. PRESS ✔ to proceed to Step 10. PRESS ✔ . Alarm settings QS2 screen Page 8 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 11 PRESS to change ( = ON) Continuous operation screen PRESS ✔ to proceed to Step 13. Note: Proceed to Step 14 if continuous operation is selected ( = ON). Page 9 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 12 Note: During the selected off periods the unit can be restarted by pressing PROCESS. A few minutes operation should be allowed before use to allow optimum water purity to be reached. Page 10 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 13 Enter the feedwater conductivity to obtain an accurate measurement. PRESS to reduce the value to the correct reading. PRESS ✔  to accept. Feed Water Quality Screen Page 11 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 14 User key identification. REPEAT 2 and 3 until all User keys are registered (maximum of 6 users). Programming of user keys screen PRESS ✔ to complete settings. Page 12 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 15 REPEAT 4 and 5 until all Sanitization keys are registered (maximum of 2 users). PRESS ✔ to complete settings. Note: After pressing ✔ the following screen shows: P1 cycles RO volume PRESS ✔ to go to STANDBY. Page 13 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 16: Setting Consumable Replacement Reminders

    Protek L1 / L2 replacement. PRESS ✔ confirm that resetting is required PRESS ✗ to abort reset. PRESS ✔ . UV lamp screen Page 14 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 17 Sanitization reminder date PRESS ✔ to accept reminder date and complete settings. PRESS ✔ confirm that resetting is required PRESS ✗ to abort reset. PRESS ✔ . Sanitization screen Page 15 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 18: Operation

    Night service/Operational day (screen 030) Refer to Section 3.2 - Steps 13 and 14. Your PURELAB 7000 - US can be programmed to operate on specific days between selected times. This is to optimize the efficiency of the unit and to minimize any rise in water temperature.
  • Page 19: Maintenance

    PROTECTIVE GLASSES AND GLOVES. Remove new UMF from packaging. INSTALL UMF and RE-CONNECT. RINSE water to drain to recommission the system. RESET consumable reminder as described in Section 3.3. Page 17 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 20: Replacing Labpure L1 Purification Cartridge

    (down) (2) in the retainers. 8. SWITCH on power. FOLLOW screen prompts to accept new cartridge replacement date. 9. START unit and allow to circulate until water quality is achieved. Page 18 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 21: Replacing Ultraviolet Lamp (Lc118)

    REFIT spring clips (1). 16. REFIT chamber (7) into the unit and TIGHTEN the two screws. 17. REFIT Labpure L1 cartridge if removed. 18. RESET consumable reminder as described in Section 3.3. Page 19 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 22: Replacing Protek L1 Or L2 Pre-Treatment Cartridge (Lc175 / Lc177)

    13. PIVOT latch (2) back and ROTATE wing (1) clockwise to secure. WARNING! ENSURE CLAMP IS SECURED BEFORE STARTING THE UNIT. 14. The unit will automatically recognise the new cartridge and date. Removal Replacement Page 20 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 23: Replacing E - Cartridge (Lc181)

    For information regarding the replacement of the Reverse Osmosis module contact Customer Services. Page 21 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 24: Sanitization

    ISOLATE application and ensure the process is OFF. PRESENT GREEN sanitization key to reader. Present the sanitization key Page 22 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 25 Measure 50 ml of Minncare cold sterilant and slowly pour into the break tank. REPLACE lid. Large white lid removal PRESENT GREEN sanitization key to confirm that the chemical have been added. Confirmation chemical is added Page 23 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 26: Recirculation Loop Sanitization

    6.1.2 RO + Recirculation loop sanitization Only required if water quality deteriorates. ISOLATE application and ensure the process is OFF. PRESENT GREEN sanitization key to reader. Present the sanitization key Page 24 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 27 5. PRESS sanitization ✓ to select recirculation. Enter RO sanitization 6. PRESS to allow the system to empty/fill the reservoir. The system will stop when the level reaches approximately 10 liters. Reservoir level adjustment Page 25 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 28 13. PRESENT GREEN sanitization key to confirm that the chemical have been added. Note: These two screens are shown alternately. PRESS left button to cancel. Confirmation chemical is added Page 26 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 29 Note: The automated rinse cycles are designed to remove the chemical sanitant from the system but for critical applications a water test is advised prior to use to ensure user specific requirements are met. Set sanitization reminder Page 27 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 30: Tablet Sanitization

    USE / CONTAINS STERILANT”. Present the sanitization key ISOLATE application and ensure the process is OFF. PRESENT GREEN sanitization key to reader. PRESS ✓ to enter sanitization process. Sanitization selection screen Page 28 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 31 ADD ¼ of EfferSan™ tablets. REPLACE lid. Large white lid removal 10. PRESENT GREEN sanitization key to confirm that the EfferSan™ tablet have been added. Confirmation EfferSan™ tablet is added Page 29 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 32: Recirculation Loop Sanitization

    6.2.2 RO + Recirculation loop sanitization Only required if water quality deteriorates. ISOLATE application and ensure the process is OFF. PRESENT GREEN sanitization key to reader. Present the sanitization key Page 30 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 33 5. PRESS sanitization ✓ to select recirculation. Enter RO sanitization 6. PRESS to allow the system to empty/fill the reservoir. The system will stop when the level reaches approximately 10 liters. Reservoir level adjustment Page 31 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 34 11. CUT 1 EfferSan™ tablet in quarters using tablet cutter. 12. UNSCREW lid on the left of the unit. 13. ADD ¼ of EfferSan™ tablets. 14. REPLACE lid. Large white lid removal Page 32 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 35 15. PRESENT GREEN sanitization key to confirm that the EfferSan™ tablets have been added. Note: These two screens are shown alternately. PRESS left button to cancel. Confirmation EfferSan™ tablet is added Page 33 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 36 Note: The automated rinse cycles are designed to remove the chemical sanitant from the system but for critical applications a water test is advised prior to use to ensure user specific requirements are met. Set sanitization reminder Page 34 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 37: Sanitization Chemical Safety Data

    Wash out the mouth thoroughly with water and give large quantities of milk to drink. Obtain MEDICAL ADVICE. Note: A comprehensive Data Sheet is available on request and is supplied with each packet of tablets. Page 35 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 38: Trouble Shooting

    (fitted to the inside of the door of the PURELAB 7000 -US). If the unit cannot be repaired using the information shown, please call your local ELGA LabWater representative (See Section 11 - Useful Contact Details). ALWAYS ENSURE THAT THE MAINS POWER SUPPLY IS ISOLATED BEFORE...
  • Page 39: Key To Control Panel

    Sanitization reminder Save data Data Date Scroll Scroll back Standby Down Drain Shift Feed Transport mode Fill Hazard User Recognition Key Locked Viewing angle Menu 24hr/7 day Mute alarm Page 37 PURELAB 7000 - US MANU40676 Version 02 - 02/16...
  • Page 40: Technical Specification

    Failure to comply with the feedwater pre-treatment recommendations will affect the life and performance of key components within the PURELAB 7000 - US and may invalidate the warranty. Feedwater requirements are specified for units fitted with a Protek L2 pre- treatment cartridge.
  • Page 41 Particles 0.05 µm filtration ** System to be regularly sanitized and installed following ELGA LabWater installation design guidelines. As part of our policy of continual improvement we reserve the right to alter the specifications given in this document. Page 39...
  • Page 42: Warranty / Conditions Of Sale

    PURELAB 7000 - US Operator Manual ELGA 10. WARRANTY / CONDITIONS OF SALE ELGA LabWater is a trading name of VWS (UK) Ltd. General Limited Warranty VWS (UK) Ltd. warrants the products manufactured by it against defects in materials and workmanship when used in accordance with applicable instructions for a period of one year from the date of shipment for the products.
  • Page 43: Useful Contact Details

    Tel: +44 (0) 203 567 7300 Fax: +44 (0) 203 567 7205 E-mail: techsupport@elgalabwater.com For the address of the nearest ELGA LabWater Sales and Service office visit the country list on our website. http//www.elgalabwater.com Or contact ELGA at the number above.