Mechanical Installation Of A Transition-Mounted D-Frame Afdh - Trane AFDH Installation Instructions Manual

D-frame upgrade adaptive frequency drive for tracer adaptiview centrifugal chiller
Table of Contents

Advertisement

Installation
Figure 24. Drilling through mounting brackets on the
evaporator
12. Bolt adapter bracket to the evaporator support brackets
with 3/8-16 X 2 in. bolts, nuts, and washers (washer on
top and bottom).
42
Figure 25. Attaching C-clamp to the adapter bracket
Mechanical Installation of a
Transition-Mounted D-Frame
AFDH
WARNING
Heavy Objects!
Failure to follow instructions below or properly lift unit
could result in unit dropping and possibly crushing
operator/technician which could result in death or
serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly
rated for the weight of the unit being lifted. Each of the
cables (chains or slings), hooks, and shackles used to
lift the unit must be capable of supporting the entire
weight of the unit. Lifting cables (chains or slings) may
not be of the same length. Adjust as necessary for even
unit lift.
WARNING
Improper Unit Lift!
Failure to properly lift unit could result in unit dropping
and possibly crushing operator/technician which could
result in death or serious injury, and equipment or
property-only damage. An AFDH cabinet assembly is
top heavy. Test lift unit approximately 24 inches to
verify proper center of gravity lift point. To avoid
dropping of unit, reposition lifting point if unit is not
level.
AFDH-SVN005B-EN

Advertisement

Table of Contents
loading

Table of Contents