Sign In
Upload
Manuals
Brands
Trane Manuals
Chiller
RTAC
Trane RTAC Air-Cooled Chiller Manuals
Manuals and User Guides for Trane RTAC Air-Cooled Chiller. We have
2
Trane RTAC Air-Cooled Chiller manuals available for free PDF download: Troubleshooting Manual, Installation, Operation And Maintenance Manual
Trane RTAC Troubleshooting Manual (74 pages)
Air and Water Cooled Chillers
Brand:
Trane
| Category:
Chiller
| Size: 3 MB
Table of Contents
Table of Contents
3
CH530 Overview
5
Main Processor
5
Starter Module
5
Power Supply Module
5
Llids (Low Level Intelligent Devices)
5
IPC Overview and Troubleshooting
7
Installing a LLID
8
Bus Connection Crimping Procedure
8
Procedure for Installing Caps
10
Troubleshooting Problems with Multiple LLIDS
11
Power Supply
14
Troubleshooting
14
Temperature Sensor
16
Sensor Checkout Procedure
16
Is the Sensor Bound and Communicating
16
Is the Sensor Reading Accurately
17
Pressure Transducers
18
Transducer Checkout Procedure
18
Is the Transducer Bound and Communicating
18
Is the Transducer Reading Accurately
19
Variable Speed Fan Control - RTAC Only
20
Startup and Operation
20
Inverter Fault Input
22
Troubleshooting the Inverter
22
Current Transformers
26
CT and Starter Compressor Current Input Checkout Procedure
27
Over/Under Voltage
30
RTAC Chillers
30
Check out Procedure for RTAC
30
Under/Over Voltage Transformer Checkout
30
RTHD Chillers
31
Check out Procedure for RTHD
31
Potential Transformer
31
Starter Module
33
Starter
34
X-Line
34
Y-Delta
34
Ydelta Starter Sequence
36
Solid State - RTHD Only
43
Compressor Capacity - RTHD
44
Checkout Procedure for the Load-Unload Outputs
44
Checkout Procedure for the Slide Valve and Load-Unload Solenoids
45
Load
47
Unload
47
Compressor Capacity - RTAC
48
Checkout Procedure for the Female Step Load Outputs
49
Checkout Procedure for the Step Load Solenoids Valve and Piston
49
Checkout Procedure for the Male Load-Unload Outputs
49
Checkout Procedure for the Slide Valve and Load-Unload Solenoids
50
Setup
50
Load
52
Unload
52
Electronic Expansion Valve
54
EXV Checkout Procedure
54
Is the EXV Bound and Communicating
54
Is the EXV Functioning Properly
55
Liquid Level Sensor
57
External LLID Sensor
57
Internal LLID
57
Liquid Level Sensor Checkout Procedure
57
Is the Sensor Bound and Communicating
57
Is the Sensor Reading Accurately
58
Gas Pump - RTHD Only
59
Gas Pump Checkout Procedure - Unit off
59
Gas Pump Checkout Procedure - Unit on
60
Optical Sensor - RTHD Only
61
Checkout Procedure
61
Techview Service Tool
62
Software Requirements
62
Hardware Requirements
62
Laptop Requirements for CH530
63
The Download Process
63
Instructions for First Time Tracer™ CH530 Users
63
Using Techview
65
Downloading New Main Processor Software
67
Binding Process
67
Binding Symbols
70
Modify Chiller Configuration
70
Advertisement
Trane RTAC Installation, Operation And Maintenance Manual (44 pages)
Brand:
Trane
| Category:
Industrial Equipment
| Size: 4 MB
Table of Contents
Table of Contents
4
General Data
5
Unit Description
5
Receiving Checklist
5
Model Number Description
6
Pre-Installation
7
Installation Checklist
7
Drainage
7
Air Vents
7
Water Pressure Gauges
7
Pipe Unions and Connectors
7
Thermometers
7
Differential Pressure
7
Balancing Valves
7
Flow Meter
7
Dimensions and Weights
8
Unit Assembly Dimensions and Weights
8
Handling
8
Installation - Mechanical
26
Flexible Hose and Hard Pipe
26
Installation
26
Flexible Hose Guidelines
26
Horizontal Hose Installation
26
Vertical Hose Installation
27
Horizontal to Vertical Installation
27
Hard Pipe Guidelines
28
Exceptions
28
Material Disposition
28
Leveling System
28
Freeze Protection
28
Flow Sensor
28
Installation - Electrical
29
Electrical Connections
29
300 And 400 Ton Electrical
29
Connections
29
Installation of Jumper Bars for Single
29
Point Power
29
Dual Point Power
29
Single Point Power
29
Shore Point Power (115 Vac)
30
Unit Voltage and Amperage Checks
31
Voltage Supply
31
Voltage Imbalance
31
Electrical Cable
31
Electrical Cable Box
32
400 And 500 Ton Trailer Mounted
32
Boxes
32
Connectors
32
Field Installed Power Wiring
33
Circuit Breaker External Handle - Factory Mounted Option
33
Main Unit Power Wiring
33
Chilled Water Pump Performance and Operation
34
Pre-Start Checkout
35
Unit Location and Mounting
35
Inspection
35
Electric Wiring
35
Shore Power
36
Unit Piping
36
Start-Up
37
Startup Procedure
37
Checking Operating Conditions
37
Differential Pressure Check
37
Final System Setup
39
Maintenance
40
Maintenance Procedures
40
Weekly/Monthly Maintenance
40
Decommissioning Procedure
40
Advertisement
Related Products
Trane RTAC 120
Trane RTAC 140
Trane RTAC 155
Trane RTAC 170
Trane RTAC 185
Trane RTAC 200
Trane RTAC 130
Trane RTAC 150 Series
Trane RTAC 225 Series
Trane RTAC 250 Series
Trane Categories
Air Conditioner
Heat Pump
Chiller
Air Handlers
Furnace
More Trane Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL