1. Large Crank Handle,
remove nuts and bolts
from the universal joint
areas. Remove handle
and set aside.
4. For Side Roll-Up
Assembly insert the
swaged connector end
into the 8 8' tube roll
up assembly tube. Drill
SDS screws to connect.
Crank Handle Assembly
2. Insert 11 swaged
connector into the
universal joint ends.
5. For the Front/Back roll-
up door assembly,
insert swaged
connector end into the
9 12' roll-up door
assembly.
3. Once 11 swaged insert
connectors are in
place, drill in SDS
screws through both
sides to secure them in
place.
4 Large Crank Handle (2)
8 8' Tubing (2)
9 12' Tube
11 Swaged connector (4)
18