Download Print this page

Advertisement

Quick Links

22'x96' - 1000 Series Installation Manual

Advertisement

loading
Need help?

Need help?

Do you have a question about the 1000 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for QUIEDAN COMPANY 1000 Series

  • Page 1 22'x96' - 1000 Series Installation Manual...
  • Page 2 22'x96' - 1000 Series Components List...
  • Page 3 Instructions Overview: 1. Slide one 17 33/33mm hinged double-clamp onto each 5 10' leg, Assembly of arcs to determine exact width of 2' in from the swaged end (see drawing). proposed structure. 2. Connect 5 legs to reinforced 6 8' center piece to create arc (drill in two 1 screws at the unions to hold tubes together).
  • Page 4 Overview: Setting up the foundation is crucial to maximizing the stability of your cold frame. Be sure to clear out the portion of land you intend to cover and flatten the ground to ensure continuity throughout the heights of all platform posts. Instructions 1.
  • Page 5 Instructions Overview: 1. With one person on each side, insert one end at a time Installation of arcs to begin over-head structure and continue until all arcs are set onto 20 anchor props. assembly. 10' leg section (pairs) 8' reinforced center 36"...
  • Page 6 Instructions Overview: 1. Using 16 33mm one-bolt strap clamps, 15 3 way Attachment of the stretchers will provide additional connectors, and 18 pivot caps, connect 7 6' tubes from the support to both ends of the cold frame since this is where the most tension is placed.
  • Page 7 Overview: Setting up arc purlins along the exterior sides of structure, attaching aluminum channel and setting up front and back enclosures. Instructions 1. Connect nine 10 10' swaged tubes and one 7 6' tube together (drill 4. Using 13 straight clamp 33/33mm, connect in two screws at the unions to hold tubes together) and use prepped 7 6' tubes to the first and last pairs of leg sections.
  • Page 8 Instructions Overview: 1. Connect ten 10 10' swaged tubes (drill in two 1 screws at the Assembling side roll-up tube. unions to hold tubes together) and connect all appropriate pieces for 3 crank handle (including 33mm swaged insert connectors if necessary). Once film is ready to be attached to side roll-up tube, clamp on one 14 4"...
  • Page 9 Instructions Overview: 1. Lay 24 film over the cold frame. Attaching film. Be sure to tape all corners and 2. Attach film to the last hoop (locking film into 23 aluminum possible sharp edges before attaching film to channel using 22 wiggle wire). prevent puncturing.
  • Page 10 Instructions Overview: 1. Measure the height (x) of the cold frame and add two feet Attaching film to cover the front and back sides. to that distance (x+2'). 2. Using the remainder of the film, cut two sheets to be 32' wide (assuming your roll of film is 32' wide) by x'+2' long (i.e.
  • Page 11 Instructions Overview: 1. Cut out an opening 4" in from the 9 12' tubes and header. Cutting out your front and back doors. 8' tube...
  • Page 12 Instructions 1. From the remaining film, cut out a 10'x10' sheet. Overview: 2. Lock the top portion of the film to the 23 aluminum channel with 22 wiggle wire approximately 6" above the header. Creating your front and back roll up doors. 3.
  • Page 13 Crank Handle Assembly 1. Large Crank Handle, 2. Insert 11 swaged 3. Once 11 swaged insert remove nuts and bolts connector into the connectors are in from the universal joint universal joint ends. place, drill in SDS areas. Remove handle screws through both and set aside.

This manual is also suitable for:

0096-1000-02210048-1000-0221