Download Print this page

QUIEDAN COMPANY 2000 Series Installation Manual page 12

Advertisement

Overview:
Setting up front and back enclosures.
Instructions
1. Gather four 8 6' tubes and add 28 aluminum channel beginning
at 12" in on both ends.
2. Using 17 33/42mm straight clamps connect prepped 8 6' tubes to the
first and last pairs of 13 platform posts.
3. Drive 24 prop stands into ground and insert 11 12' tubes at the
appropriate distance so that they can be connected by the
prepped 8 6' tubes.
4. Cut both 11 12' tubes approximately
the top of the the 12' tubes to the hoop using the 18 oblique clamps.
5. Using 16 33/33mm straight clamps, clamp the other ends
of 8 6' tubes to 11 12' posts.
6. Attach a 10 10' tube to create the door header
using 16 straight clamp 33/33mm
7. Repeat this for opposite side of structure.
1
" below the hoop. Attach
2
8
6' tube (8)
10
10' tube (2)
11
12' tube (4)
13
platform post
16
straight clamp 33/33mm (16)
17
33/42mm straight clamp (8)
18
33/33 oblique clamp (4)
24
prop stop (4)
28
aluminum channel (20)

Advertisement

loading

This manual is also suitable for:

0048-2000-90-02210048-2000-stnd-0221