Download Print this page

Advertisement

Quick Links

22'x48' - 2000 Series Installation Manual

Advertisement

loading

Summary of Contents for QUIEDAN COMPANY 2000 Series

  • Page 1 22'x48' - 2000 Series Installation Manual...
  • Page 2 22'x48' - 2000 Series Components List...
  • Page 3 Overview: Setting up the foundation is crucial to maximizing the stability of your cold frame. Be sure to clear out the portion of land you intend to cover and flatten the ground to ensure continuity throughout the heights of all platform posts. Instructions 1.
  • Page 4 Instructions Overview: 1. Use pneumatic pounder to install 13 platforms 2'-6" Inserting platform posts. in the ground at insertion points. 2. Be sure that the top of the platforms are leveled. platform post (18)
  • Page 5 Overview: Instructions Preparing platform posts by attaching 1. Grab eight 21 40/42mm one bolt strap clamps. Drop uni-directional tops. one onto the third and fourth 13 platform posts of each corner (see picture below). 2. Set 25 uni-directional tops on the heads of 13 platforms and align appropriately.
  • Page 6 Instructions Overview: Connecting platform posts at all four corners to 1. Using 17 33mm/42mm straight clamps, 19 3 way connectors, 23 pivot caps and 21 33mm/42mm one bolt strap clamps, connect create support bracing. six foot 33mm tubes and 9 eight foot 33mm tubes (as shown below) to reinforce corners.
  • Page 7 Overview: Instructions 1. Slide one 33/33mm hinged double-clamp onto each 6 10' leg, 2' in from Installation of arcs to begin over-head structure the swaged end (see drawing). assembly. 2. Connect 6 10' legs to 7 8' reinforced center piece to create arc (drill in two 1 screws at the unions to hold tubes together).
  • Page 8 Instructions Overview: 1. Using 20 33mm one bolt strap clamps, 21 42mm one-bolt Attachment of the stretchers will provide additional strap clamps, and 23 pivot caps, connect 10 10' tubes from the end support to both ends of the cold frame since this is arcs to the appropriate platform posts as shown below.
  • Page 9 Overview: Instructions Setting up arc purlins along the interior 1. Connect four 12 10' swaged tubes together plus one 9 8' tube (drill in two 1 screws at the and exterior sides of arc. unions to hold tubes in place) to create one purlin. Construct four purlins (two interior and two exterior) and connect them to arcs using 22 33/33mm hinged double clamps.
  • Page 10 Overview: Instructions Attaching aluminum channel to first and last 1. Drill 28 aluminum channel along the top side of the first and last arcs. arcs as well as on the exterior purlins as shown. aluminum channel (24)
  • Page 11 Overview: Instructions Assembling side roll-up tube (a total of two). 1. Connect five 12 10' swaged tubes (drill in two 1 screws at the unions to hold tubes together) and connect all appropriate pieces for 3 crank handle (including 14 33mm swaged insert connectors if necessary).
  • Page 12 Instructions Overview: 1. Gather four 8 6' tubes and add 28 aluminum channel beginning Setting up front and back enclosures. at 12" in on both ends. 2. Using 17 33/42mm straight clamps connect prepped 8 6' tubes to the first and last pairs of 13 platform posts. 3.
  • Page 13 Instructions Overview: 1. Begin by leaving 12" of film sticking outwards Attaching film to create roll-up sidewalls. Be sure past the sides, and 4" upwards past the top of the channel. to tape all corners and possible sharp edges before 2.
  • Page 14 Instructions Overview: 1. Lay film over the cold frame. Attaching film to create ceiling cover. 2. Attach film to the last hoop (locking film into 28 aluminum channel with 27 wiggle wire). 3. Pull the front very tight and lock film into the front hoop's 28 aluminum channel (film must be put on tightly to prevent flapping which can cause potential tearing).
  • Page 15 Instructions Overview: 1. Measure the height (x) of the cold frame and add two feet Attaching film to cover the front and back sides. to that distance (x+2'). 2. Using the remainder of the 29 film, cut two sheets to be 32' wide (assuming your roll of film is 32' wide) by x'+2' long (i.e.
  • Page 16 Instructions Overview: 1. Cut out an opening 4" in from the 11 12' tubes and header. Cutting out your front and back doors. 12' tube...
  • Page 17 Instructions 1. From the remaining film, cut out a 11'x12' sheet. Overview: 2. Lock the top portion of the film to the 23 aluminum channel with Creating your front and back roll up doors. 27 wiggle wire approximately 6" above the header. 3.
  • Page 18 Crank Handle Assembly 1. Large Crank Handle, 2. Insert 11 swaged 3. Once 11 swaged insert remove nuts and bolts connector into the connectors are in from the universal joint universal joint ends. place, drill in SDS areas. Remove handle screws through both and set aside.

This manual is also suitable for:

0048-2000-90-02210048-2000-stnd-0221