Download Print this page

QUIEDAN COMPANY 2000 Series Installation Manual page 11

Advertisement

Overview:
Assembling side roll-up tube (a total of two).
Instructions
1. Connect five 12 10' swaged tubes (drill in two 1 screws at the
unions to hold tubes together) and connect all appropriate
pieces for 3 crank handle (including 14 33mm swaged insert
connectors if necessary). Once film is ready to be attached
to side roll-up tube, clamp on one 15 4" abs cuff at every foot
as shown (repeat this to create a second roll up for opposite
side of structure).
2. See page 18 for Large Crank Handle assembly details.
10
12
14
15
1
sds screws
3
crank handle (2)
10' tubing (2)
10' swaged tube (10)
33mm swaged insert connector (4)
4" abs cuff (134)

Advertisement

loading

This manual is also suitable for:

0048-2000-90-02210048-2000-stnd-0221