Before Use; Installation Location; Power Connection - Riso Perfect Binder G10 200 User Manual

For comcolor gd series printer
Table of Contents

Advertisement

Before Use

This section describes the precautions that must be
observed before using the unit.

Installation Location

Observe the following precautions.
■ Your dealer will help you determine a proper
installation location for the unit upon delivery.
■ When moving the unit, contact your service
representative.
■ Avoid installing the unit in the following
locations. Otherwise, incorrect operation,
malfunction, or accident might occur.
• Places exposed to direct sunlight or excessive
illumination such as near a window
(If such is unavoidable, install curtains to cover the
window.)
• Places subject to sudden temperature variations
• Places excessively hot and humid or cold and dry
• Places close to fire or heat
• Places directly subject to cold air from air
conditioners or hot air from heaters, as well as
radiant heat
• Places with poor air permeability or ventilation
• Dusty places
• Places subject to excessive vibration
■ Install the unit in a place whose levelness is
within the following specified range.
Installation surface level: 2 degrees or less
■ Operate the unit under the following
environment conditions.
Temperature range: 15 °C - 30 °C (59 °F - 86 °F)
Humidity range: 40% - 70% RH (non-condensing)

Power Connection

Observe the following precautions.
■ Connect the plug securely to the optional
connection outlet on the printer main unit to
avoid a loose connection.
■ Install the unit near an electrical outlet.
■ When the main power switch of this unit is on,
the power of the unit will turn on and off
together with the power of the printer.
Perfect Binder User's Guide
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Perfect binder g10 120

Table of Contents