Complete The Installation - Kohler 72218T-B7-CP Installation And Care Manual

Response electronic kitchen faucet
Table of Contents

Advertisement

4.

Complete the Installation

Position the Weight
Position the weight between 2 " (51 mm) and 3" (76 mm) from the cabinet floor.
Secure the clamp around the spray hose just below the weight.
Extend and retract the spray hose to check for smooth operation.
Check for Leaks
Ensure all connections are tight.
Test the faucet for proper operation. Refer to the "Faucet Operation" section.
Check all connections for leaks. Make adjustments as needed.
完成安装
定位配重块
距机柜底板2" (51 mm)与3" (76mm)之间定位配重块。
确保围绕花洒软管的夹子正好位于配重块之下。
拉伸和收缩花洒软管以检查是否平稳操作。
检查泄漏情况
确保紧固所有连接。
请参阅"龙头操作"章节,测试龙头正常运作。
检查所有连接有无泄漏,并按需进行调节。
1198298-2-C
2" (51 mm) –
3" (76 mm)
10
Kohler Co.

Advertisement

Table of Contents
loading

Table of Contents