Loopback Test Procedures; Loopback Operation - ADC HiGain ELU-319 5E User Manual

Table of Contents

Advertisement

150-319-205-05, Issue 5
L
T
OOPBACK
EST
The following sections provide step-by-step test procedures for the ELU-319 as a function of the loopback option
selected. These procedures allow verification of the integrity of the HDSL channels at every module location as
well as the G.703 channels to the customer and the local G.703 interface.
If trouble is encountered on the ELU-319 List 5E G.703 interface, verify that the ELU is making a positive
connection with its mounting assembly (shelf) connector.
The transmit and receive E1 G.703 ports have splitting access jacks and miniature, 210-series, bridging jacks as
shown in
Figure 1 on page
SPAN jacks splits the XMT and RCV and creates metallic loopbacks towards both the G.703 and the ELU-319.
If separate plugs are inserted into both SPAN jacks with the other end disconnected, the BRG jacks can be used
to send and receive test patterns towards the G.703.
L
O
OOPBACK
PERATION
The complete family of loopbacks that a HiGain system equipped with the EDU-409 can execute is shown in
Figure
23. Six of those loopbacks, NDU1, NDU2, NDU3; CDU1, CDU2, CDU3 occur in the doubler. The
loopbacks can be initiated from the ELU RS-232 craft port, the ELU front-panel MODE and SEL buttons, or from
a family of Special Loopback (SPLP) inband loopback commands.
Figure 23. Non-doubler and Doubler Loopback Configurations
ELU-319 List 5E and List 6E
P
ROCEDURES
6. Connecting one cable between the two bridging jacks and another between the two
January 26, 2000

Loopback Operation

43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Higain elu-319 6e150-1236-55150-1236-65

Table of Contents