Felton AXISS Smartflow AXISS FD-SFCSMC Installation Manual

Thermostatic shower mixer

Advertisement

Quick Links

INSTALLATION GUIDE
A X I S S
Digital Smartflow® Thermostatic Shower Mixer
FD -SFC SM C
1
AXISS DIGITAL SMARTFLOW® INSTALLATION GUIDE

Advertisement

Table of Contents
loading

Summary of Contents for Felton AXISS Smartflow AXISS FD-SFCSMC

  • Page 1 INSTALLATION GUIDE A X I S S Digital Smartflow® Thermostatic Shower Mixer FD -SFC SM C AXISS DIGITAL SMARTFLOW® INSTALLATION GUIDE...
  • Page 2 FELTON...
  • Page 3: Table Of Contents

    CONTENT Notice Tools Required Measurements Scope of Application Control Unit Pre-Line Installation Digital Mixer Installation Connecting the Flow Controller Control Housing Final Fit Installation Operational test Troubleshooting Warranty AXISS DIGITAL SMARTFLOW® INSTALLATION GUIDE...
  • Page 4: Notice

    MAINTENANCE Felton products are made of high quality materials and require only minimal maintenance. The following maintenance tips help to preserve the surface and prevent damage through incorrect cleaning. Fittings and control parts should be wiped dry after used. Only use mild cleaning products that contain soap. The following must not be used: Scourers, abrasive sponges, hydrochloric acid, lime, plaster or cement removers,...
  • Page 5: Measurements

    BOX 1 DIGITAL MIXER 3. Flow Control Unit 2. 12V AC Adapter (Cable length: 1m) 1. Temperature Control Unit 4. Set of Screws: 2x 5x50mm 5. Adapter Set 6. 2x Inlet hoses (supplied) BOX 2 CONTROL UNIT 1. Control Housing 2. Control Wheel 3. Control Mounting Tube 4. Set of Screws: 6 x 2.5 x 16 mm &...
  • Page 6: Scope Of Application

    Access panel Digital mixer Power supply must Warning be within 1m Please make sure the power source is installed by from the digital mixer a qualified electrician and complies to Electrical Hot in Cold in standard/NZ laws. Important: The TLC Temp Flow must have an access panel. FELTON...
  • Page 7: Control Unit Pre-Line Installation

    CONTROL UNIT PRE-LINE INSTALLATION Cutting down the Control Housing (OPTIONAL) NOTE: We recommend the Control Housing is cut down as shown using a hacksaw Attaching the Control Housing Prepare the wall to take the Control Housing. The installation of the Control Housing will depend on each individual situation. Control Housing is attached from the front: a 70mm diameter hole is required in a fixing nog flush with face of the timber framing. Conduits should be used in the walls where necessary to protect the cables and allow maintenance.
  • Page 8: Digital Mixer Installation

    DIGITAL MIXER INSTALLATION Remove the cover Inside the Temperature Control Unit TLI-W Fixing holes Transformer 12V / wall plug Flow controller unit Cover retaining holes Fixing hole Cold Outlet Inlets FELTON...
  • Page 9 MOUNTING OPTIONS Refer to Scope of Application on p6 for the plumbing layout MOUNTING FOR NOG 56  m m  99  m m  If installed vertically, use orientation Install the Digital Mixer Mark fixing holes shown MOUNTING FOR CONCRETE 56  m m  56  m m  99  m m  ø ...
  • Page 10 6. Connect the two Inlet hoses with the MF adaptors and filters to the water supply feed Large retaining bolt Hot inlet Cold inlet A - Connect the brass adaptors into the flexi hoses. B - Fit both flexi hoses (with the brass adaptor on) firmly into the unit box. C - Fit the large retaining bolt with a torx screw driver supplied. FELTON...
  • Page 11: Connecting The Flow Controller

    CONNECTING THE FLOW CONTROLLER A. Fit the outlet pipe and the brass connector onto the Flow control unit. Short retaining bolt Flow control unit B. Push a Flow control unit with outlet fitting back into the Digital Mixer and fit ADVICE: the short retaining bolt with torx screw Push in firmly! driver supplied. AXISS DIGITAL SMARTFLOW® INSTALLATION GUIDE...
  • Page 12: Control Housing Final Fit Installation

    CONTROL HOUSING FINAL FIT INSTALLATION Fit off - after final wall lining is installed Draw a line around the collar, flush with the wall. Cut down the collar as marked. Final wall lining Final wall lining FELTON...
  • Page 13 10 Assemble/attach the chrome flange Attach the back plate/adaptor ring to the Control Housing using the 15mm screws supplied. Note: The black adaptor ring must be flush with the brass back plate. MOUNTING RING BLACK FOAM SEAL CHROME FLANGE MOUNTING RING Front mounting ring must be facing towards you (installer) Remove the Control Wheel AXISS DIGITAL SMARTFLOW® INSTALLATION GUIDE...
  • Page 14 Fit white foam seal through cable to end of interface wheel. Note: Do not stretch white foam seal Insert white foam seal onto mounting ring Position white foam seal 14 Turn Control Housing clockwise to lock in position & re-attach the Control Wheel Position the Control Housing into the chrome flange assembly and turn clockwise to lock in position. Push fit the Control Wheel onto the Control Housing. Push and twist to lock INSERT FELTON...
  • Page 15 Connect the Flow Controller Unit to the Digital Mixer Flow Controller Unit IMPORTANT: Fit cables into slots to allow cover to properly close at end of installation Connect Data Control Cable from Control Wheel assembly to Digital Mixer AXISS DIGITAL SMARTFLOW® INSTALLATION GUIDE...
  • Page 16 Digital Mixer with Flow Control Unit installed: Power cable connection IMPORTANT: Fit cables into slots to allow cover to properly close at end of installation IMPORTANT: Electrical supply must be installed by a qualified electrician (if required). Please Note: Leave the torx taped to the box for future use FELTON...
  • Page 17: Operational Test

    OPERATIONAL TEST 1 Ensure that the Digital Mixer is installed correctly installed according to the instructions above. Turn on the water supply and check the unit and plumbing for leaks. Once the plumbing is confirmed to be water-tight, connect the power suply and conduct the operational test below. Digital Mixer with Flow Control Unit installed 2 Open Close Push the Axiss Smartflow Interface once. Push the Axiss Smartflow Interface again. The Digital Mixer opens and the The Digital Mixer closes LED illuminates.
  • Page 18: Troubleshooting

    Carry out function «Diagnostic Test» temperature and flow adjustment* The interface is defective in User Guide The knob is not running smoothly Remove and clean knob If issue persists or is not covered in the above, please contact our Felton Technical Team on 0800 743 358 or sales@felton.co.nz FELTON...
  • Page 19: Warranty

    WARRANTY 5 year warranty applies to all Felton branded products including the electronic hardware and its components. Where products are promoted as having a “5 year warranty”, Felton Industries Limited guarantees the electronic components of these products (excluding batteries) to be free from defects in materials and workmanship under normal installation, use and service for a period of five (5) years from the date of purchase. Fair wear and tear is expressly excluded. This warranty is effective for five (5) years from the date of purchase and covers electronic replacement parts only (excluding batteries) and 2 years from the date of purchase for plumber’s labour relating solely to repairing or replacing the Hardware, provided the product is installed by a registered plumber. You must retain proof of...
  • Page 20 @ f e l t o n . c o . n z | F i n d u s o n S o c i a l M e d i a @feltontapware /feltonltd /FeltonIndustriesLimited @feltonltd /felton-industries-limited 150322EI...

Table of Contents