1
PCT COOLING TOWER

Introduction

WARNING: Failure to use
designated lifting points
can result in a dropped load
causing severe injury, death,
and/or property damage.
Lifts must be performed by
qualified riggers following BAC
published Rigging Instructions
and generally accepted
lifting practices. The use of
supplemental safety slings
may also be required if the
lift circumstances warrant
its use, as determined by the
rigging contractor.
WARNING: Only personnel
qualified to do so should
undertake the installation,
operation, maintenance, and
repair of this equipment.
Proper care, procedures,
and tools must be used in
handling, lifting, installing,
operating, maintaining, and
repairing this equipment to
prevent personal injury and/or
property damage.
M A R 1 0 9 - 1
2
W W W . B A L T I M O R E A I R C O I L . C O M . A U

Safety

Adequate precautions appropriate for the installation and location
of these products should be taken to safeguard the equipment and
the premises from damage and the public from possible injury. The
procedures listed in this manual must be thoroughly reviewed prior to
rigging and assembly. Read all warnings, cautions, and notes detailed
in the margins.
When the fan speed of the unit is to be changed from the factory set
speed, including the use of a variable speed device, steps must be
taken to avoid operating at or near the fan's "critical speed" which
could result in fan failure and possible injury or damage. Consult with
your local BAC Representative on any such applications.

Shipping

BAC PCT Cooling Towers are factory assembled to ensure uniform
quality with minimum field assembly. As standard, models ship in
two sections per cell (lower and upper). Optional shipment of three
sections per cell and optional containerized shipments are available.
Contact your local BAC Representative for more information. For the
dimensions and weights of a specific unit or section, refer to the
submittal drawings.

Pre-Rigging Checks

When the unit is delivered to the jobsite, it should be checked
thoroughly to ensure all required items have been received and are free
of any shipping damage prior to signing the bill of lading.
The following parts should be inspected:
‰ Sheaves and Belts
‰ Bearings
‰ Bearing Supports
‰ Fan Motor(s)
‰ Fan Guard(s)
‰ Fan(s) and Fan Shaft(s)
‰ Float Valve Assembly(s)
‰ Fill
‰ Water Distribution System
‰ Cold Water Basin Accessories
‰ Interior Surfaces
‰ Exterior Surfaces
‰ Louvres
‰ Mating Surfaces Between
Sections/Modules
‰ Miscellaneous Items:
All bolts, nuts, washers,
and sealer tape required
to assemble sections
or component parts are
furnished by BAC and
shipped with the unit.
A checklist inside the
envelope marked "Customer
Information Packet"
indicates what miscellaneous
parts are included with the
shipment and where they are
packed. This envelope will
be attached to the side of
the unit or located in a box
inside the unit.