LTPH-SM-1014-03, Issue 3
B
Y
EFORE
Prior to installing the Wideband 3190, it is important to prepare for the installation by
Reviewing installation plans through establishing a Method of Procedure
Unpacking and inspecting the system components, and
Gathering the tools for the installation
R
I
EVIEWING
NSTALLATION
Installation personnel, engineers, and Central Office (CO) supervisors, involved in the installation of the
HMS-358, should participate in the preparation of a Method of Procedure (MOP) for approval by CO
management.
E
STABLISHING A
Following is a list of tasks and considerations that need to be addressed and mutually agreed upon before
proceeding with installation:
Assignment of personnel
Installation tools and methods
Protection requirements for personnel, equipment, and tools
Evaluation of potential hazards that may affect service
Scheduled time for installation
Space requirements (see
Power requirements (see
Identification of procedures and tests required before connecting to working equipment
Identification of work steps and any necessary notifications to CO personnel or engineers before work begins
Assignment of individual system IDs for up to 32 managed systems
(see
"Setting the Shelf Identifier (Option D)" on page
Assignment of IP addresses for each installed system
(see
"Setting the Local IP Address (Option A)" on page
HMS-358 List 1 and List 2
B
OU
EGIN
P
LANS
M
P
ETHOD OF
"Power Requirements" on page
"Power Requirements" on page
January 12, 2001
ROCEDURE
88)
88)
35)
36)

Before You Begin