NEW BRUNSWICK SCIENTIFIC innOva 4200 Manual To Operation page 34

Incubator shaker
Table of Contents

Advertisement

34
2. Connect the hot wire to terminal 1.
3. Connect the neutral wire to terminal 3.
4. Connect the ground wire to the ground terminal on the
5. Attach the
in the
TERMINAL BLOCK
6. Use the
METAL BRACKET
7. Screw the
8. Push the
RUBBER GROMMET
9. Push the
WASHER
10. Screw the
hand tightening the
tightening the
plug.
11. Connect the
12. Turn off all the power switches.
13. Remove the cover to the internal socket. The socket is on the upper right side, inside
the shaker chamber.
14. Plug the
ELECTRICAL PLUG
hand tightening the knurled knob.
NOTE:
The socket is keyed so that it will only go in when oriented properly.
15. Use the knurled knob and tighten the plug finger tight to obtain a good seal.
Your ancillary equipment operates whenever the main power switch and AC switch are
powered on.
NOTE:
Use of ancillary equipment in the Innova 4200 may affect the operating
temperature range of the Innova 4200. This is due to the additional heat
generated by the ancillary equipment used.
New Brunswick Scientific
to the
STRAIN RELIEF
.
, captivate the wires and secure with the
onto the
MAIN BODY
TERMINAL BLOCK
into the end of the
on.
onto the
PLASTIC NUT
RUBBER GROMMET
to the
PLASTIC NUT
to the ancillary equipment if applicable.
POWER CORD
into the internal socket, and secure the plug in place by
. Slide the two legs into the slots
TERMINAL BLOCK
.
MAIN BODY
and tighten. Ensure a tight seal by
MAIN BODY
to compress the
also provides a water seal for the
MAIN BODY
.
TERMINAL BLOCK
TWO SCREWS
.
. Securely
POWER CORD
User's Guide
.

Advertisement

Table of Contents
loading

Table of Contents