BEKOMAT
®
14i / 14i CO / 14i CO PN25

13.2 Dismantling work

For dismantling work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have 
been completed.
Tools
Spanner or adjustable end wrench
1.
Decommissioning has been completed.
Depressurise the pressurised system or the respective system section and secure it against unintentional
2.
pressurisation.
Illustration
X3
X4
F
F
68 | 76
Prerequisites
No material necessary
Preparatory tasks
Dismantling work
X5
24
X3
X4
X5
24
Original installation and operation manual
Material
Description / explanation
1. Remove the hose [X5] from the hose connection [24]
and disassemble.
2. Remove the condensate inlet line [X3] and the
recommended shut-off valve [X4] from the condensate
inlet [F] and disassemble.
3. Disassemble all power supplies.
Protective equipment
Always to be worn: