13.2 Dismantling work
For dismantling work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
Spanner or adjustable end wrench
1.
Decommissioning has been completed.
Depressurise the pressurised system or the respective system section and secure it against unintentional
2.
pressurisation.
Illustration
X3
X4
F
F
68 | 76
Prerequisites
•
No material necessary
Preparatory tasks
Dismantling work
X5
24
X3
X4
X5
24
Original installation and operation manual
Material
Description / explanation
1. Remove the hose [X5] from the hose connection [24]
and disassemble.
2. Remove the condensate inlet line [X3] and the
recommended shut-off valve [X4] from the condensate
inlet [F] and disassemble.
3. Disassemble all power supplies.