Commissioning

20 Commissioning
In this chapter

20.1 Overview: Commissioning

20.2 Precautions when commissioning

20.3 Checklist before commissioning

Installer and user reference guide
82
20.1
Overview: Commissioning ......................................................................................................................................................
20.2
Precautions when commissioning..........................................................................................................................................
20.3
Checklist before commissioning.............................................................................................................................................
20.4
To perform a test run .............................................................................................................................................................
This chapter describes what you have to do and know to commission the system
after it is installed.
Typical workflow
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing a test run for the system.
INFORMATION
During the first running period of the unit, the required power may be higher than
stated on the nameplate of the unit. This phenomenon is caused by the compressor,
that needs a continuous run time of 50 hours before reaching smooth operation and
stable power consumption.
NOTICE
Before starting up the system, the unit MUST be energised for at least 6  hours to
avoid compressor breakdown during startup.
NOTICE
ALWAYS operate the unit with thermistors and/or pressure sensors/switches. If NOT,
burning of the compressor might be the result.
NOTICE
Cooling operation mode. Perform the test run in cooling operation mode so that
stop valves failing to open can be detected. Even if the user interface was set to
heating operation mode, the unit will run in cooling operation mode during 2‑3
minutes (although the user interface will display the heating icon), and then
automatically switch to heating operation mode.
1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
82
82
82
84
EKVDX32~100A2VEB
VRV system air conditioner
4P664010-1 – 2021.08

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ekvdx32a2vebEkvdx50a2vebEkvdx80a2vebEkvdx100a2veb

Table of Contents