Download Print this page

Satellite ASPEN II Assembly Instructions Manual page 12

Advertisement

9. FASTEN FRONT TO BASE
IMPACT BASE ( #10034 Solid Floor or #10033 Grid Floor)
• Lay the toilet on its back.
• Install (5) Screws #13860 in holes at bottom of front assembly using 3/8" HEX NUT DRIVER BIT.
• Remove shipping screws (4) & shipping strap.
• Open door install (1) Screw #13860 on inside of door frame.
10-5-21
REV A
24048 INSTRUCTION- ASPEN II
11
Shipping strap & screws
11
(5)
12

Advertisement

loading

Related Products for Satellite ASPEN II