Download Print this page

Advertisement

Quick Links

ASPEN II
Unit Assembly Instructions
2530 Xenium Lane North, Minneapolis, MN 55441
Telephone: 763-553-1900
Fax: 763-553-1905
800-328-3332 / www.satelliteindustries.com
10-5-21
REV A
24048 INSTRUCTION- ASPEN II
1

Advertisement

loading

Summary of Contents for Satellite ASPEN II

  • Page 1 ASPEN II Unit Assembly Instructions 2530 Xenium Lane North, Minneapolis, MN 55441 Telephone: 763-553-1900 Fax: 763-553-1905 800-328-3332 / www.satelliteindustries.com 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 2: Helpful Hints

    INTRODUCTION Satellite portable restrooms must be assembled according to approved assembly procedures. Avoid variations in assembly procedures which could adversely affect product life and warranty. IMPORTANT: Do not remove shipping screws / shipping strap from bottom door until instructed to in the “Install the Front Assembly”...
  • Page 3: Exploded Drawing

    EXPLODED DRAWING 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 4 HDWE- ASPEN II 3 ROLL (#23829) Shown to the left 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 5 ** NOTE: SIDE PANELS MUST BE FLUSH WITH SPACING RIBS AT EACH CORNER. DO NOT OVER TIGHTEN SCREWS IMPACT BASE SPACER RIBS SPACER RIBS SPACER CENTER LINE RIBS CENTER SPACER BUMP RIBS SCREWS (15) 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 6 Note rivet from outside of panel with washer inside. • Repeat process for remaining rear corner. (16) DIAGRAM #8 Make sure panels overlap exactly like above. Otherwise they will not fit together properly 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 7 • Transfer drill through side tab on urinal through panel. • Rivet side tab to panel using rivet #22543 outside on panel and washer #11315 inside on tab of urinal. Dimple in left panel 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 8 • Locate 4 dimples in right panel & drill at dimples using 1/4 DRILL BIT. • Rivet Paperguard #22209 using (4) Rivets #22543 outside on panel and (4) Washers #11315 inside on paperguard. • Insert spindle #22310 in Paper guard as shown. 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 9 6. INSTALL ROOF • Place Roof #23830 on top of panels.. • Rivet Roof to panels using (15) Rivets #11030 outside on Roof and (15) Washers #11315 inside on panels. (15) Roof (15) Panel 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 10 • Transfer drill through 2 pre-drilled holes in bottom of shelf collar (left & right side) into vent pipe using #10 or (3/16”) DRILL BIT. • Rivet shelf with (2) Rivets #22604. TWIST & PUSH 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 11: Front Assembly

    • Rivet Roof to Front starting with the center two holes using (2) Rivets #14427 • Install remaining (4) Rivets #14427 in Roof to Front. 2 RIVETS FIRST IN (16) ROOF ROOF FRONT ASSEMBLY 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 12 • Install (5) Screws #13860 in holes at bottom of front assembly using 3/8” HEX NUT DRIVER BIT. • Remove shipping screws (4) & shipping strap. • Open door install (1) Screw #13860 on inside of door frame. Shipping strap & screws 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 13 • Tighten screw/nut using #2 Phillips Head Driver Bit & 7/16” HEX NUT DRIVER or DRIVER BIT. • DO NOT OVER-TIGHTEN Tighten screw/ nut so handle is snug & not so loose that it could fall to closed position. 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...
  • Page 14 • Rivet handle to door using (6) Rivets #22604. Dimple for coat hook • Peel protective coating from mirror 2530 Xenium Lane North, Minneapolis, MN 55441 Telephone: 763-553-1900 Fax: 763-553-1905 800-328-3332 / www.satelliteindustries.co 10-5-21 REV A 24048 INSTRUCTION- ASPEN II...