Fig. 4 — Supplemental Energy Recovery Section Equipment Support
Step 4 — Rig and Place Unit —
and do not drop. Spreader bars are not required if top crating is
left on unit. Rollers may be used to move unit across a roof.
Remove the bottom wooden skids that are under the unit by
removing the wooden plates that hold the bottom wooden
frame to the unit. Level by using unit frame as a reference. Lift-
ing holes are provided in base rails as shown in Fig. 6A and 6B.
Refer to rigging instructions on unit.
All panels must be in place when rigging.
POSITIONING — Maintain clearance around and above unit
to provide minimum distance from combustible materials,
proper airflow, and service access. A properly positioned unit
will have the following clearances between unit and roof curb:
1
/
-in. clearance between roof curb and base rails on each side
4
1
and duct end of unit;
/
-in. clearance between roof curb and
4
condenser coil end of unit.
Do not install unit in an indoor location. Do not locate unit
air inlets near exhaust vents or other sources of contaminated
air.
Be sure that unit is installed such that snow will not block
the combustion intake or flue outlet.
4"
SCREW
SUPPORT
IN PLACE
10" x B (SEE CHART)
PROTECTIVE
RUBBER PAD
(EPDM)
Keep unit upright
Class A, B, or C roof-covering material when roof curb is used.
higher level runoff and overhangs.
ance of 4 ft from electric and gas meters, gas regulators, and
gas relief equipment.
parts is 48 inches.
such that flue gas will not affect building materials. Locate
mechanical draft system flue assembly at least 48 in. from an
adjacent building or combustible material.
provided for proper operation of this equipment. Be sure that
installation complies with all local codes and Section 5.3, Air
for Combustion and Ventilation, NFGC (National Fuel Gas
Code), and ANSI (American National Standards Institute)
Z223.1, and NFPA (National Fire Protection Association)
54 TIA-54-84-1. In Canada, installation must be in accordance
with the CAN1-B149 installation codes for gas burning
appliances.
materials.
6
EQUIPMENT SUPPORT
UNIT SIZE
PART NUMBER
CRAQSUPT001A00
3-6 Ton
CRAQSUPT002A00
CRAQSUPT003A00
7
1
/
-12
1
/
Ton
2
2
CRAQSUPT004A00
ENERGY
RECOVERY
SECTION
PAD
ADJUSTABLE
EQUIPMENT
SUPPORT
Unit may be installed directly on wood flooring or on
Although unit is weatherproof, guard against water from
Flue vent discharge must have a minimum horizontal clear-
Minimum distance between unit and other electrically live
Flue gas can deteriorate building materials. Orient unit
Adequate combustion- and ventilation-air space must be
After unit is in position, remove rigging skids and shipping
DIMENSIONS (in.)
A
B
C
36.9 40
8 to 14
36.9 40 14 to 24
49.7 54
8 to 14
49.7 54 14 to 24
HVAC UNIT
CURB
ROOF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cobra 48hj004-014Cobra 50hj004-014

Table of Contents