Hitachi L100 Instruction Manual page 35

L100 series
Hide thumbs Also See for L100:
Table of Contents

Advertisement

2–4
Toll Free: voice: 1-877-539-2542 fax: 1-800-539-2542 www.mgitech.com
Technologies Inc.
Orientation to Inverter Features
3. Third-level access - First, ensure no power
source of any kind is connected to the
inverter. If power has been connected, wait
five minutes after powerdown and verify
the Power LED is off to proceed. Then
locate the recessed retention screw on the
left side main front panel (it is along the
left hinge area on some models, or behind
the first access door on others). Use a small
screwdriver (Regular or Phillips) to loosen
the screw. Swing the door around to the left
to reveal the internal components of the
drive. The two-level tiered 12-position
terminal block accepts wires for the power
input and wires to the motor.
Notice the housing partition that lifts out to
allow full access to the terminals for wiring as
shown. Never operate the inverter drive with
the partition removed or the full access door
opened.
The alarm circuit connections are accessible
on the 3-position connector near the modular
connector on the rear of the main panel door.
The nearby relay provides both normally-
open and normally-closed logic for interface
to an external alarm. The alarm circuit may
carry hazardous live voltages even when the
main power to the inverter is off. So, never
directly touch any component on the circuit board in the panel door. A notch in the
removable partition serves as the exit path for alarm circuit wiring.
The following sections will describe the
system design and guide you through a
step-by-step installation process. After the
section on wiring, this chapter will show
how to use the front panel keys to access
functions and edit parameters.
Retention screw
Alarm
connector
Housing partition
Power and motor
connector terminals

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents