Pump - Riello GI/EMME 1400 Installation, Use And Maintenance Instructions

Dual fuel light oil/ gas burners
Table of Contents

Advertisement

5.14

Pump

5.14.1 Technical data
Pump
Min. delivery rate at 40 bar pressure
Delivery pressure range
Max. suction depression
Viscosity range
Maximum light oil temperature
Max. suction and return pressure
Pressure calibration in the factory
5.14.2 Priming pump (example)
Before starting the burner, make sure that the tank
return line is not clogged.
Obstructions in the line could cause the sealing
ATTENTION
organ located on the pump shaft to break.
 In order for self-priming to take place, the screw 4) on the
pump (Fig. 21) must be loosened to bleed off the air
contained in the suction line.
 Start the burner by closing the remote controls. As soon as
the burner starts, check the direction of rotation of the fan
blade.
 The pump can be considered to be primed when the light oil
starts coming out of the screw 4).
 Close the burner and undo the screws 4).
The time required for this operation depends upon the diameter
and length of the suction tubing.
If the pump fails to prime at first start-up and the burner locks out,
wait approx. 15 seconds, reset the burner, and then repeat the
start-up operation. And so on.
After 5 or 6 starting operations allow 2 or 3 minutes for the
transformer to cool.
Do not light the photocell in order to prevent the burner lockout;
the burner locks out in any case about ten seconds after its start.
The above-mentioned operation is possible
because the pump is already full of fuel when it
leaves the factory.
ATTENTION
If the pump has been drained, fill it with fuel
through
the
3)(Fig. 21) prior to starting; otherwise, the pump
will seize.
Whenever the length of the suction piping
exceeds 20-30 meters, the supply line must be
filled using a separate pump.
20160907
kg/h
bar
cm Hg
cSt
°C
bar
bar
opening
on
the
vacuometer
Installation
G/M 1400
G/M 2000
TA2C
TA3C
350
540
7 - 40
7 - 40
30
30
4 - 800
4 - 800
140
140
5
25
25
D11321
Key (Fig. 21)
1
Suction line
2
Return line
3
Vacuometer connection
4
Pressure gauge connection
5
Pressure adjuster
22
GB
G/M 3000
TA4C
730
7 - 40
30
4 - 75
140
5
5
25
G/M 4500
TA5C
1000
7 - 40
30
4 - 75
140
5
25
Tab. K
Fig. 21

Advertisement

Table of Contents
loading

Table of Contents