Initial Start-Up Checklist - Carrier AquaEdge 19MV Start-Up, Operation And Maintenance Instructions Manual

19mv two-stage high-efficiency semi-hermetic centrifugal liquid chillers with greenspeed® intelligence, pic6 controls, and r-134a/r-513a 50/60 hz
Table of Contents

Advertisement

FOR 19MV SEMI-HERMETIC TWO-STAGE CENTRIFUGAL LIQUID CHILLER
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Start-Up, Operation, and Maintenance Instructions
document.
MACHINE INFORMATION:
NAME
ADDRESS
CITY
DESIGN CONDITIONS:
TONS
BRINE
(kW)
EVAPORATOR
CONDENSER
CHILLER LINE SIDE:
REFRIGERANT: Type:
CARRIER OBLIGATIONS:
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions
2. Machine Assembly, Wiring and Piping Diagrams
3. Starting Equipment Details and Wiring Diagrams
4. Applicable Design Data (see above)
5. Diagrams and Instructions for Special Controls
INITIAL MACHINE PRESSURE:
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
RECORD ACTUAL PRESSURE DROPS Evaporator
CHARGE REFRIGERANT:
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53190079-01

INITIAL START-UP CHECKLIST

(Remove and use for job file.)
STATE
FLOW
TEMPERATURE
RATE
IN
Volts
FLA
Charge
Disassembled at Job Site . . . . . . . .
Assemble... . . . . . .
. . . . . . . . . .
Leak Test . . . . . . . . . . . . . . . . . . .
Dehydrate . . . . . . . . . . . . . . . . . .
Charging . . . . . . . . . . . . . . . . . . .
Operating Instructions
YES
Initial Charge
Printed in U.S.A.
SALES ORDER NO.
MODEL
ZIP
TEMPERATURE
PRESSURE
OUT
DROP
OLTA
Yes No 
Yes No 
Yes No 
Yes No 
Yes No 
NO
Final Charge After Trim
Form 19MV-CLT-1SS
Pg CL-1
S/N
SUCTION
PASS
TEMPERATURE
******
Yes 
No 
Yes 
No 
Yes 
No 
Yes 
No 
Yes 
No 
Hrs.
Condenser
4-22
CONDENSER
TEMPERATURE
******
Replaces: NEW

Advertisement

Table of Contents
loading

Table of Contents