Mitsubishi Electric MSZ-RW25VG Service Manual page 53

Indoor unit
Hide thumbs Also See for MSZ-RW25VG:
Table of Contents

Advertisement

OPERATING PROCEDURE
7. Removing the vertical vane motor units (R) (L)
and the vertical vane motors (R) (L)
(1) Remove the front panel, horizontal vanes (upper R/L)
(lower R/L), the corner boxes (R) (L), the panels (U)
(R) (L), V.A. clamp, the electrical cover, Wi-Fi assem-
bly, the panel (F), and DISPLAY and i-see SENSOR
ASSEMBLY.
(2) Remove the following connector (Photo 8):
<Indoor electronic control P.C. board>
CN151 (Vane motors)
(3) Pull out the drain hose from the nozzle assembly. Pull
and remove the nozzle assembly (4 catches) (Photo
12).
(4) Cut off the cable tie to secure the lead wires on the
right side of the nozzle assembly (Photo 15).
Removing the horizontal vane motor unit (R) and the ver-
tical vane motor (R) (Photo 15,16)
(5) Remove the 3 screws of the horizontal motor unit (R)
indicated in (Photo15), and remove the lead wires of
the vane motors (R).
(6) Disengage the catch of the horizontal vane motor unit
(R), and remove the horizontal vane motor unit (R)
(Photo15).
(7) Disengage the link of the vertical vane motor unit (R).
(8) Disengage the catch of the vertical vane motor unit
(R), and remove the vertical vane motor (R) from the
vertical vane motor unit (R), (Photo16-1).
OBH902A
PHOTOS/FIGURES
Photo 15
3 screws of the
horizontal
vane motor unit (R)
Cable tie
Photo 16
Vertical Vane motor unit (R)
Photo 16-1
53
Screw of the
Catch of the horizontal
vertical vane
vane motor unit (R)
motor (R)
Link
Catch

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msz-rw35vgMsz-rw50vg-e

Table of Contents